IDEAS home Printed from https://ideas.repec.org/a/ibn/ibrjnl/v10y2017i12p139-147.html
   My bibliography  Save this article

Determining Critical Success Factors that Contribute to the Delay of Water Infrastructure Construction Projects in the Abu Dhabi Emirtae: A Conceptual Framework

Author

Listed:
  • Jaafer Y. Altarawneh
  • Vinesh Thiruchelvam
  • Behrang Samadi

Abstract

The purpose of this study is to investigate the relationship between the critical success factors and the critical delays in the context of water infrastructure construction projects (WICPs) in the Abu Dhabi Emirate. In addition, the purpose of this paper is to develop a conceptual model to investigate the potential relationship. The literature concerning the critical success and delay factors and the related models that are available provide a starting point for developing the conceptual model. Based on the comprehensive and thorough literature review, all the dimensions of the variables are identified and discussed in detail. This study attempts to reduce the existing gap in the literature regarding the relationship between the critical success factors and critical delay. It forms a foundation upon which further local research can be conducted. In addition, it attempts to identify and point out the most critical success factors that will minimize the delay claims in water infrastructure construction projects (WICPs), as such delays would lead to some of the most difficult and controversial disputes to resolve. Internationally, it is expected that the findings of this research may help as an evidentiary reference data on which other and further similar comparative researches could be initiated and developed in different environments in terms of cultural, social, contractual, political, and environmental mediums. Finally, the conceptual framework was developed by identifying six (6) variables for project critical success namely Project Management Process (PMP), Project Manager Competency (PMC), Project Team Members’ Competency (PTC), Project Organizational Planning (POP), Project Resources’ Utilization (PRU) and Project Organizational Commitment (POC).

Suggested Citation

  • Jaafer Y. Altarawneh & Vinesh Thiruchelvam & Behrang Samadi, 2017. "Determining Critical Success Factors that Contribute to the Delay of Water Infrastructure Construction Projects in the Abu Dhabi Emirtae: A Conceptual Framework," International Business Research, Canadian Center of Science and Education, vol. 10(12), pages 139-147, December.
  • Handle: RePEc:ibn:ibrjnl:v:10:y:2017:i:12:p:139-147
    as

    Download full text from publisher

    File URL: http://www.ccsenet.org/journal/index.php/ibr/article/view/71700/39197
    Download Restriction: no

    File URL: http://www.ccsenet.org/journal/index.php/ibr/article/view/71700
    Download Restriction: no
    ---><---

    More about this item

    Keywords

    Abu Dhabi; construction delay; construction projects; critical success factors; success factors;
    All these keywords.

    JEL classification:

    • R00 - Urban, Rural, Regional, Real Estate, and Transportation Economics - - General - - - General
    • Z0 - Other Special Topics - - General

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ibn:ibrjnl:v:10:y:2017:i:12:p:139-147. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Canadian Center of Science and Education (email available below). General contact details of provider: https://edirc.repec.org/data/cepflch.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.