IDEAS home Printed from https://ideas.repec.org/a/ibn/assjnl/v19y2023i4p70.html
   My bibliography  Save this article

The Relationship Between Interest and Liquidated Damages in Construction Contracts

Author

Listed:
  • Zhijun Shi

Abstract

There are certain differences in practice regarding whether the contractor of a construction project construction contract can claim both the contractual or statutory interest and liquidated damages from the employer. From the origin and essence of interest, it can be known that it is a part of the "proceeds" obtained by the lender according to the contract. As long as the delayed payment behavior exists, interest becomes the property that the right holder will inevitably lose. The consequences of the aforementioned "loss" have a direct causal relationship with the debtor's breach of contract and there is no difference due to the construction project or contract. As far as liquidated damages are concerned, they are also a form of liability for breach of contract, with the main purpose of compensating for the losses of the observant party. It is not inappropriate to classify the interest lost by the right holder as a loss under the scope of liability for breach of contract. The basic legal relationship between the employer and the contractor arising from the construction of the project is a contract of contract, not a loan contract. As for the outstanding project funds of the employer, it undoubtedly belongs to the category of overdue payments that are payable but not paid.

Suggested Citation

  • Zhijun Shi, 2023. "The Relationship Between Interest and Liquidated Damages in Construction Contracts," Asian Social Science, Canadian Center of Science and Education, vol. 19(4), pages 1-70, August.
  • Handle: RePEc:ibn:assjnl:v:19:y:2023:i:4:p:70
    as

    Download full text from publisher

    File URL: https://ccsenet.org/journal/index.php/ass/article/download/0/0/48996/52825
    Download Restriction: no

    File URL: https://ccsenet.org/journal/index.php/ass/article/view/0/48996
    Download Restriction: no
    ---><---

    More about this item

    JEL classification:

    • R00 - Urban, Rural, Regional, Real Estate, and Transportation Economics - - General - - - General
    • Z0 - Other Special Topics - - General

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ibn:assjnl:v:19:y:2023:i:4:p:70. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Canadian Center of Science and Education (email available below). General contact details of provider: https://edirc.repec.org/data/cepflch.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.