Author
Listed:
- Jianjian Yang
- Wenjie Luo
- Yuchen Zhang
- Boshen Chang
- Ruiliang Zheng
- Miao Wu
- Xingling Shao
Abstract
A coal mine roadway is a longitudinally limited space with curves and branches, low illumination and high humidity, a large amount of dust, and an unstructured terrain environment. Traditional ICP algorithms have the defects of slow convergence speed and it is easy to fall into local optimums. While the NDT algorithm in the NDT + ICP algorithm has high registration efficiency, poor stability, and low registration accuracy, which are not suitable for point clouds with noise and a large amount of data. By calculating the FPFH value, the detailed description of the point cloud will be greatly increased to increase the robustness and accuracy Therefore, a feature registration method based on the FPFH + ICP algorithm is proposed to reduce the modeling error of excavation roadways and meet the requirements of intelligent excavation. First, outliers caused by dust are treated by the Euclidean clustering point cloud segmentation method, and then the calculation of the normal vector in the FPFH feature descriptor is optimized based on extracting key points from the roadway structure. The surface normal vector of each key point and its neighborhood point is estimated according to the measured point and its neighborhood point. The initial coordinate transformation matrix of a point cloud of an excavated roadway is obtained by the SAC-IA algorithm and transferred to the ICP algorithm. Finally, KD-tree is introduced into the ICP algorithm to accelerate the search speed of corresponding point pairs, and the Gauss–Newton method is used to optimize the solution of the nonlinear objective function of the algorithm to complete accurate registration of point clouds in an excavation roadway.
Suggested Citation
Jianjian Yang & Wenjie Luo & Yuchen Zhang & Boshen Chang & Ruiliang Zheng & Miao Wu & Xingling Shao, 2022.
"Establishment of a Coal Mine Roadway Model Based on Point Cloud Feature Matching,"
Mathematical Problems in Engineering, Hindawi, vol. 2022, pages 1-14, October.
Handle:
RePEc:hin:jnlmpe:8809521
DOI: 10.1155/2022/8809521
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hin:jnlmpe:8809521. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Mohamed Abdelhakeem (email available below). General contact details of provider: https://www.hindawi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.