Author
Listed:
- Zhiwei Wang
- Weibin Ma
- Ricardo Branco
Abstract
Based on the repeated “tensile-compressive-tensile-compressive†stress characteristics of tunnel-base concrete structure, double scalar damage variables were defined using the concrete stochastic damage mechanics. The elastoplastic Helmholtz free energy was corrected by introducing the hardening parameter. A stochastic dynamic damage constitutive model with the nonlinear and strain-rate effect behavior of concrete was derived via dynamic expansion of damage energy based on the principle of energy dissipation. An “elastic prediction-plastic correction†numerical analysis algorithm was developed based on the solution of the probability density evolution equation. Secondary development of the algorithm was achieved using the Universal Distinct Element Code (UDEC) for numerical calculation of the proposed constitutive model. A comparison was made between the calculation result and the result of laboratory rapid uniaxial compression test to verify the model. Dynamic response and damage features of the tunnel-base structure in three working conditions, i.e., filled layer without seam, filled layer with seam and ground water, and filled layer with seam but without water, were analyzed based on engineering practice. According to the analysis, structural vibration response was intensified in the presence of a seam. With and without groundwater, the vertical dynamic stress attenuation at both sides of the seam was 41.07% and 47.13%, respectively; vertical vibration acceleration was attenuated by 91.17% and 91.73%, respectively; and the acceleration amplitude at the upper structure of the seam increased by 724.67% and 765.02%, respectively. Groundwater in the seam would aggravate damage accumulation. It could be seen from the analysis that the current design parameters satisfied the antifatigue requirements within the design reference period at a train speed of 300 km/h when there was no seam in the tunnel-base concrete structure with IV-class surrounding rocks. When there was a seam in the tunnel-base concrete structure, however, antifatigue life was 56 years in the presence of groundwater and 62 years without groundwater, which suggested that current design parameters failed to satisfy the antifatigue requirements within the design reference period.
Suggested Citation
Zhiwei Wang & Weibin Ma & Ricardo Branco, 2022.
"Dynamic Response and Fatigue-Life Analysis of High-Speed Railway Tunnel Base with Defects,"
Mathematical Problems in Engineering, Hindawi, vol. 2022, pages 1-20, January.
Handle:
RePEc:hin:jnlmpe:6622998
DOI: 10.1155/2022/6622998
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hin:jnlmpe:6622998. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Mohamed Abdelhakeem (email available below). General contact details of provider: https://www.hindawi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.