Abstract
To deeply understand the mechanism of the rock mass caving and associated surface subsidence during sublevel caving mining, the Xiaowanggou iron mine was selected as an engineering project case study. The study area was analyzed by means of an in situ geological investigation and numerical simulation. First, a borehole television (BHTV) system and a GPS monitoring system were used to monitor the caving process of the roof rock mass and the development of the surface subsidence; the monitoring time was thirteen months. Then, a numerical simulation was used to analyze the damage evolution of the rock mass. Research shows the following: in situ geological monitoring results indicate that the caving process of the roof rock mass presents intermittent characteristics, where slow caving and sudden caving are conducted alternatively and the arched-caving trend is more pronounced with continuous mining. The surface subsidence, horizontal displacement, and horizontal deformation of the hanging wall are higher than that of the footwall, and the subsidence center gradually deflects to the hanging wall in the late stage of the +45m sublevel mining. Numerical simulation results indicate that the extension and penetration of the shear and tensile cracks along the joints and intact rock bridges are the main factors causing the rock mass caving and the existence of the stress arch and its evolution process is the fundamental reason for the intermittent caving of the rock mass. The rapid development of damage to the hanging wall (the damage angle reduced) is the main cause of the deflection of the subsidence center affected by joints and the mining size. In the future of mining, large-scale subsidence will occur on the surface of the hanging wall.
Suggested Citation
Fengyu Ren & Dongjie Zhang & Jianli Cao & Miao Yu & Shaohua Li, 2018.
"Study on the Rock Mass Caving and Surface Subsidence Mechanism Based on an In Situ Geological Investigation and Numerical Analysis,"
Mathematical Problems in Engineering, Hindawi, vol. 2018, pages 1-18, July.
Handle:
RePEc:hin:jnlmpe:6054145
DOI: 10.1155/2018/6054145
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hin:jnlmpe:6054145. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Mohamed Abdelhakeem (email available below). General contact details of provider: https://www.hindawi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.