IDEAS home Printed from https://ideas.repec.org/a/hin/jnlmpe/452602.html
   My bibliography  Save this article

Note on a Single-Machine Scheduling Problem with Sum of Processing Times Based Learning and Ready Times

Author

Listed:
  • Shang-Chia Liu
  • Wei-Ling Hung
  • Chin-Chia Wu

Abstract

In the recent 20 years, scheduling with learning effect has received considerable attention. However, considering the learning effect along with release time is limited. In light of these observations, in this paper, we investigate a single-machine problem with sum of processing times based learning and ready times where the objective is to minimize the makespan. For solving this problem, we build a branch-and-bound algorithm and a heuristic algorithm for the optimal solution and near-optimal solution, respectively. The computational experiments indicate that the branch-and-bound algorithm can perform well the problem instances up to 24 jobs in terms of CPU time and node numbers, and the average error percentage of the proposed heuristic algorithm is less than 0.5%.

Suggested Citation

  • Shang-Chia Liu & Wei-Ling Hung & Chin-Chia Wu, 2015. "Note on a Single-Machine Scheduling Problem with Sum of Processing Times Based Learning and Ready Times," Mathematical Problems in Engineering, Hindawi, vol. 2015, pages 1-9, July.
  • Handle: RePEc:hin:jnlmpe:452602
    DOI: 10.1155/2015/452602
    as

    Download full text from publisher

    File URL: http://downloads.hindawi.com/journals/MPE/2015/452602.pdf
    Download Restriction: no

    File URL: http://downloads.hindawi.com/journals/MPE/2015/452602.xml
    Download Restriction: no

    File URL: https://libkey.io/10.1155/2015/452602?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Xiufang Zhang & Tangbin Xia & Ershun Pan & Yuqing Li, 2022. "Integrated optimization on production scheduling and imperfect preventive maintenance considering multi-degradation and learning-forgetting effects," Flexible Services and Manufacturing Journal, Springer, vol. 34(2), pages 451-482, June.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hin:jnlmpe:452602. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Mohamed Abdelhakeem (email available below). General contact details of provider: https://www.hindawi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.