- Nancy M. Arratia-Martinez
- Nelly M. Hernandez-Gonzalez
- Fernando Lopez-Irarragorri
Abstract
A project portfolio can be defined as a set of project proposals that are selected according to one or more criteria by a decision-maker (individual or group). Regularly, the portfolio selection involves different decision problems, among those evaluation, selection, scheduling, and resource allocation. In published scientific literature, these problems have been addressed mainly separately giving as a result suboptimal solutions (portfolios). In addition, elements as partial allocation and project representation through tasks constitute relevant characteristics in practice that remain unaddressed in depth. The proposal of this research is to integrate the project selection and project scheduling, incorporating all relevant elements of both decision problems through the scheduling of tasks allowing to determine when the task will be funded and executed. The main impact of precedence rules at the task level in the portfolio is also studied. In this work, Project Portfolio Selection and Scheduling Problem (PPSS) is studied and solved through a new mixed-integer linear programming (MILP) model. The model incorporates renewable and nonrenewable resource allocation, along with partial and total funding policies, project divisibility, and interdependences. Scheduling is integrated into the model, both at the project level and at the project task level, which allows scheduling in noncontiguous periods. Small instances (up to 64 projects) and medium instances (up to 128 projects) were solved optimally in very short times. The relationship between the quality of near-optimal solutions and the solution computing time by modifying the parameters of the solver employed was researched. No significant change in the solution’s quality was perceived, but a significant reduction in solution computing time was achieved. Furthermore, the main effects of precedence rules on solution times and portfolio impact were studied. Results show that even if few precedence rules were introduced, the resource allocation of tasks changed significantly, even though the portfolio impact or the number of projects of the selected portfolios remains the same.
Suggested Citation
Nancy M. Arratia-Martinez & Nelly M. Hernandez-Gonzalez & Fernando Lopez-Irarragorri, 2021.
"Project Portfolio Selection and Scheduling with Resource Allocation, Synergies, and Project Divisibility,"
Mathematical Problems in Engineering, Hindawi, vol. 2021, pages 1-14, December.
Handle:
RePEc:hin:jnlmpe:4163287
DOI: 10.1155/2021/4163287
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hin:jnlmpe:4163287. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Mohamed Abdelhakeem (email available below). General contact details of provider: https://www.hindawi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.