Author
Listed:
- Chen Cong
- Hu Jianping
- Zhang Qingkai
- Zhang Meng
- Li Yibai
- Nan Feng
- Cao Guangqiao
Abstract
When the outbreak of COVID-19 began, people could not go out. It was not allowed to provide agricultural machinery services in different places across regions to reduce the flow and gathering of people. Improvement of utilization efficiency of agricultural machinery resources is required through scientific scheduling of agricultural machinery. With seizing the farming season and stabilizing production as the goal, this paper studied the scientific scheduling of tractors within the scope of town and established agricultural machinery operation scheduling model with the minimization of total scheduling cost as the optimization objective. Factors such as farmland area, agricultural machinery, and farmland location information and operating time window are considered in this model to improve the accuracy of the agricultural machinery operation scheduling model. The characteristics of multiple scheduling algorithms are analyzed comprehensively. The scheduling requirements of agricultural machinery operation to ensure spring ploughing are combined to design the agricultural machinery scheduling algorithm based on the SA algorithm. With Hushu Street, Jiangning District, Nanjing City, as an example, a comparative experiment is conducted on the simulated annealing algorithm (SA) designed in this paper and the empirical algorithm and genetic algorithm (GA). The results suggest that the total cost of the scheduling scheme generated by the SA algorithm is 19,042.07 yuan lower than that by the empirical scheduling algorithm and 779.19 yuan lower than that by the genetic algorithm on average. Compared with the GA algorithm, the transfer distance, waiting cost, and delay cost of the SA algorithm are reduced by 11.6%, 100%, and 98.1% on average, indicating that the transfer distance of agricultural machinery in the scheduling scheme generated by the SA algorithm is shorter, so is the waiting and delay time. Meanwhile, it can effectively obtain the near-optimal solution that meets the time window constraint, with good convergence, stability, and adaptability.
Suggested Citation
Chen Cong & Hu Jianping & Zhang Qingkai & Zhang Meng & Li Yibai & Nan Feng & Cao Guangqiao, 2021.
"Research on the Scheduling of Tractors in the Major Epidemic to Ensure Spring Ploughing,"
Mathematical Problems in Engineering, Hindawi, vol. 2021, pages 1-11, July.
Handle:
RePEc:hin:jnlmpe:3534210
DOI: 10.1155/2021/3534210
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hin:jnlmpe:3534210. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Mohamed Abdelhakeem (email available below). General contact details of provider: https://www.hindawi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.