Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

Author

Listed:
  • Ming Li
  • Guangdong Wu

Abstract

Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illustrate the robust model, nondominated sorting genetic algorithm-II (NSGA-II) is modified to solve the project example. The results show that, by means of adjusting the time and cost robust coefficients, the robust Pareto sets for time-cost tradeoff can be obtained according to different acceptable risk level, from which the decision maker could choose the preferred construction alternative.

Suggested Citation

  • Ming Li & Guangdong Wu, 2014. "Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects," Abstract and Applied Analysis, Hindawi, vol. 2014, pages 1-7, August.
  • Handle: RePEc:hin:jnlaaa:926913
    DOI: 10.1155/2014/926913
    as

    Download full text from publisher

    File URL: http://downloads.hindawi.com/journals/AAA/2014/926913.pdf
    Download Restriction: no

    File URL: http://downloads.hindawi.com/journals/AAA/2014/926913.xml
    Download Restriction: no

    File URL: https://libkey.io/10.1155/2014/926913?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Qingfeng Meng & Zhen Li & Jianguo Du & Huimin Liu & Xiang Ding, 2019. "Negotiation for Time Optimization in Construction Projects with Competitive and Social Welfare Preferences," Complexity, Hindawi, vol. 2019, pages 1-13, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hin:jnlaaa:926913. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Mohamed Abdelhakeem (email available below). General contact details of provider: https://www.hindawi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.