Author
Listed:
- Lilesh Gautam
(Department of Civil Engineering, Manav Rachna International Institute of Research and Studies, Faridabad 121004, India)
- Vaishali Sahu
(Department of Multidisciplinary Engineering, The NorthCap University, Gurugram 122017, India)
- Robin Singh
(Department of Multidisciplinary Engineering, The NorthCap University, Gurugram 122017, India)
- Senthil Vadivel Thiyagarajan
(Department of Civil Engineering, Manav Rachna International Institute of Research and Studies, Faridabad 121004, India)
- Ardra Suseelan
(Department of Civil Engineering, Manav Rachna International Institute of Research and Studies, Faridabad 121004, India)
Abstract
Construction projects in metro areas often experience big delays, which make the projects take longer, cost more, and use resources less efficiently. Getting rid of these delays is necessary to make the project run more smoothly and waste less material, which is in line with the ideals of smarter production. This study’s goal is to find, examine, and rank the most important reasons that cause Indian metro projects to be late while also suggesting long-term answers that use lean methods. This study is needed because train projects are becoming more complicated, and people want more environmentally friendly building methods. A total of 38 people from the government, business, and other building sectors filled out an organized questionnaire poll that was used to collect data. To get a full picture of the delay factors, a quantitative approach was used. This included a Likert scale, ranking, percentage analysis, the relative importance index (RII), and SPSS analysis. These methods were picked to make sure that the delays were accurately measured and that answers could be put in order of importance. This study found 19 specific reasons for delay and put them into seven main groups. The results show that delays are mostly caused by links to utilities and other equipment outside the building. Lean methods, which focus on reducing waste and making the best use of resources, are suggested as good ways to cut down on these delays and encourage better production in metro building projects.
Suggested Citation
Lilesh Gautam & Vaishali Sahu & Robin Singh & Senthil Vadivel Thiyagarajan & Ardra Suseelan, 2024.
"Sustainable Solutions for Metro Project Delays: Lean Practices for Enhanced Resource Efficiency and Cleaner Production,"
Sustainability, MDPI, vol. 16(24), pages 1-13, December.
Handle:
RePEc:gam:jsusta:v:16:y:2024:i:24:p:10897-:d:1542335
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:16:y:2024:i:24:p:10897-:d:1542335. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.