Author
Listed:
- Yixuan Zhang
(State Key Laboratory of Power System Environmental Protection, Wuhan 430072, China
School of Electrical Engineering and Automation, Wuhan University, Wuhan 430072, China)
- Zoujun Wang
(State Grid Hunan Electric Power Company, Changsha 410118, China)
- Kaiwen Feng
(State Grid Changzhou Electric Power Company, Changzhou 213000, China)
- Yirui Zhang
(State Key Laboratory of Power System Environmental Protection, Wuhan 430072, China
School of Electrical Engineering and Automation, Wuhan University, Wuhan 430072, China)
- Zhitong Tian
(State Key Laboratory of Power System Environmental Protection, Wuhan 430072, China
School of Electrical Engineering and Automation, Wuhan University, Wuhan 430072, China)
- Zhihui Zheng
(State Key Laboratory of Power System Environmental Protection, Wuhan 430072, China
School of Electrical Engineering and Automation, Wuhan University, Wuhan 430072, China)
- Hailiang Lu
(State Key Laboratory of Power System Environmental Protection, Wuhan 430072, China
School of Electrical Engineering and Automation, Wuhan University, Wuhan 430072, China)
Abstract
Transmission tower grounding safety is a critical element that significantly impacts the reliability and sustainability of power grids. Tower grounding resistance is a significant grounding characteristic parameter. In order to accurately measure the grounding resistance of towers using the clamp meter method in both single-tower and multi-tower parallel scenarios, this paper establishes theoretical calculation models for measuring tower grounding resistance using the clamp meter method. Considering the interaction between the artificial grounding device and the tower foundation, this paper models and simulates transmission towers and lightning shield wires, analyzing the influencing factors on the grounding resistance measurement results using the clamp meter method in both single- and multi-tower parallel scenarios. The results show that for single towers, the clamp meter measurement results increase with decreasing foundation root spacing and increasing length of the artificial device’s extension lines, but the changes are relatively small. In multi-tower grounding scenarios, due to the shunting effect of the parallel branches formed by the towers and lightning shield wires, the value is smaller than in single-tower grounding scenarios. Changing the number of parallel towers and the type of lightning shield wire produces little effect on the measurement results. However, changes in soil resistivity have the most significant impact. Therefore, correction formulas for the impact of soil resistivity on clamp meter measurements are proposed and then verified by applying them to field tests.
Suggested Citation
Yixuan Zhang & Zoujun Wang & Kaiwen Feng & Yirui Zhang & Zhitong Tian & Zhihui Zheng & Hailiang Lu, 2024.
"Accurate Measurement of Tower Grounding Resistance for Single-Tower and Multi-Tower Parallel Scenarios Based on the Clamp Meter Method: For the Sustainable Operation of Towers,"
Sustainability, MDPI, vol. 16(17), pages 1-14, August.
Handle:
RePEc:gam:jsusta:v:16:y:2024:i:17:p:7551-:d:1468439
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:16:y:2024:i:17:p:7551-:d:1468439. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.