IDEAS home Printed from https://ideas.repec.org/a/gam/jsusta/v15y2023i19p14225-d1248131.html
   My bibliography  Save this article

Factors Affecting the Bidding Decision in Sustainable Construction

Author

Listed:
  • Omar Binshakir

    (Civil Engineering Department, American University of Sharjah, Sharjah 26666, United Arab Emirates)

  • Lulwa AlGhanim

    (Civil Engineering Department, American University of Sharjah, Sharjah 26666, United Arab Emirates)

  • Afreen Fathaq

    (Civil Engineering Department, American University of Sharjah, Sharjah 26666, United Arab Emirates)

  • Alsharif Mohamed AlHarith

    (Civil Engineering Department, American University of Sharjah, Sharjah 26666, United Arab Emirates)

  • Salma Ahmed

    (Civil Engineering Department, American University of Sharjah, Sharjah 26666, United Arab Emirates)

  • Sameh El-Sayegh

    (Civil Engineering Department, American University of Sharjah, Sharjah 26666, United Arab Emirates)

Abstract

The environmental harms that the construction industry has caused are significantly detrimental and apparent. These harms include the emittance of a substantial amount of carbon dioxide and inducing ground and water contamination. Fortunately, these adverse environmental impacts can be minimized and counteracted by carrying out sustainable construction projects. As sustainable construction projects gain more popularity and are increasingly in demand, it is crucial for those who will execute these projects to be knowledgeable about the nature of sustainable construction projects and be able to determine whether to bid for these projects. The bidding decision is one of the critical decisions that contractors have to make due to the complexity and uncertainty surrounding this choice. Given the above challenge, this research aims to identify the most significant factors that affect the bidding decision in sustainable construction. The methodology adopted in this research is a mix of qualitative and quantitative analysis. An extensive literature review was first conducted to determine the bidding decision factors. After that, a survey was distributed to United Arab Emirates (UAE) construction professionals, where they were asked to rank the significance of the 40 extracted factors. The weighted average approach was then used to prioritize the most significant factors of the bidding decision in sustainable construction. The results showed that the top 10 ranking factors were as follows: client’s financial capabilities, client’s payment history, client’s reputation, project risks, contractor’s financial capabilities, project complexity, experience in similar projects, project type, contractor’s access to technologies required to execute sustainable projects, and material availability. The findings of this research can benefit contractors and subcontractors by increasing their understanding of the major factors affecting the bidding decision in sustainable construction. Contractors armed with such invaluable information will be better equipped to reach more effective better bidding decisions.

Suggested Citation

  • Omar Binshakir & Lulwa AlGhanim & Afreen Fathaq & Alsharif Mohamed AlHarith & Salma Ahmed & Sameh El-Sayegh, 2023. "Factors Affecting the Bidding Decision in Sustainable Construction," Sustainability, MDPI, vol. 15(19), pages 1-15, September.
  • Handle: RePEc:gam:jsusta:v:15:y:2023:i:19:p:14225-:d:1248131
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/15/19/14225/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/15/19/14225/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Abdulrahman Salem Bageis & Chris Fortune, 2009. "Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors," Construction Management and Economics, Taylor & Francis Journals, vol. 27(1), pages 53-71.
    2. Mohammed Fadhil Dulaimi & Hon Guo Shan, 2002. "The factors influencing bid mark-up decisions of large- and medium-size contractors in Singapore," Construction Management and Economics, Taylor & Francis Journals, vol. 20(7), pages 601-610.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Tirataci Hakan & Yaman Hakan, 2023. "Estimation of ideal construction duration in tender preparation stage for housing projects," Organization, Technology and Management in Construction, Sciendo, vol. 15(1), pages 192-212, January.
    2. Jean Richard Jokhu & Rofikoh Rokhim1 & Riani Rachmawati1 & Mohammad Hamsal, 2019. "Strategic Decision Process in SME’s Context: A New Perspective Using Indigenous, Institution, Firm, and Environment Characteristics," International Journal of Economics & Business Administration (IJEBA), International Journal of Economics & Business Administration (IJEBA), vol. 0(4), pages 68-83.
    3. J P Pastor-Ferrando & P Aragonés-Beltrán & A Hospitaler-Pérez & M García-Melón, 2010. "An ANP- and AHP-based approach for weighting criteria in public works bidding," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(6), pages 905-916, June.
    4. Joe Wong & Eddie Hui, 2006. "Construction project risks: further considerations for constructors' pricing in Hong Kong," Construction Management and Economics, Taylor & Francis Journals, vol. 24(4), pages 425-438.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:15:y:2023:i:19:p:14225-:d:1248131. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.