Author
Listed:
- Deyi Wu
(National-Local Joint Engineering Laboratory of Building Health Monitoring and Disaster Prevention Technology, College of Civil Engineering, Anhui Jianzhu University, Hefei 230601, China)
- Nanyu Li
(National-Local Joint Engineering Laboratory of Building Health Monitoring and Disaster Prevention Technology, College of Civil Engineering, Anhui Jianzhu University, Hefei 230601, China)
- Shuang Zhou
(National-Local Joint Engineering Laboratory of Building Health Monitoring and Disaster Prevention Technology, College of Civil Engineering, Anhui Jianzhu University, Hefei 230601, China)
Abstract
The stability of the gas extraction roadway is very important for the safe mining of coal and gas. The compression arch formed by the combined action of the prestressed bolt (cable) support and surrounding rock has been widely used in the engineering practice of the gas extraction roadway. It is of great engineering application value to analyze the influence of prestressed bolt (cable) parameters on the compression arch. In this paper, combined with the engineering practice of the deep roadway in Huainan and Huaibei mining area of Anhui Province, the mechanical parameters of surrounding rock are measured via field coring and the laboratory. The numerical simulation software FLAC 3D is used to analyze the typical position of fractured mudstone, mudstone, sandy mudstone and muddy sandstone under the bolt pre-tightening force of F = 50 kN, 70 kN and 100 kN; the bolt spacing of a × b = 400 mm × 400 mm, 500 mm × 500 mm and 600 mm × 600 mm; the bolt length of L = 1500 mm, 2000 mm, 2600 mm and 3000 mm; and the distribution characteristics of additional compressive stress on the surface of the side. The influence of the different lithology and bolt parameters on the thickness and strength of the compression arch was analyzed, and on this basis, prestressed anchor cables with a pre-tightening force of F = 80 kN, 100 kN and 120 kN and length of L = 3000 mm, 4000 mm and 6000 mm were applied, and their influence on the thickness and strength of the compression arch was analyzed. The results show that the bolt pre-tightening force (F) and the bolt length (L) have a significant effect on the thickness of the compression arch, while the surrounding rock lithology, the bolt spacing (a × b), the anchor cable pre-tightening force (F) and the anchor cable length (L) have no obvious effect on the thickness of the compression arch. The surrounding rock lithology, the bolt pre-tightening force (F), the bolt length (L), the bolt spacing (a × b), the anchor cable pre-tightening force (F) and the anchor cable length (L) have a significant effect on the strength of the compression arch.
Suggested Citation
Deyi Wu & Nanyu Li & Shuang Zhou, 2023.
"Thickness and Strength Analysis of Prestressed Anchor (Cable) Compression Arch Based on Safe Co-Mining of Deep Coal and Gas,"
Sustainability, MDPI, vol. 15(13), pages 1-16, July.
Handle:
RePEc:gam:jsusta:v:15:y:2023:i:13:p:10716-:d:1188985
Download full text from publisher
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:15:y:2023:i:13:p:10716-:d:1188985. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.