IDEAS home Printed from https://ideas.repec.org/a/gam/jsusta/v14y2022i21p13781-d951770.html
   My bibliography  Save this article

Research on the Height of the Water-Conducting Fracture Zone in Fully Mechanized Top Coal Caving Face under Combined-Strata Structure

Author

Listed:
  • Donghai Jiang

    (College of Energy and Mining Engineering, Shandong University of Science and Technology, Qingdao 266590, China)

  • Yinfeng Tang

    (College of Energy and Mining Engineering, Shandong University of Science and Technology, Qingdao 266590, China)

  • Wanpeng Huang

    (College of Energy and Mining Engineering, Shandong University of Science and Technology, Qingdao 266590, China)

  • Keke Hou

    (College of Energy and Mining Engineering, Shandong University of Science and Technology, Qingdao 266590, China)

  • Yi Luo

    (Shanxi Gaohe Energy Co., Ltd., Changzhi 046000, China)

  • Jiangwei Liu

    (College of Energy and Mining Engineering, Shandong University of Science and Technology, Qingdao 266590, China)

Abstract

In order to study the development height of the water-conducting fracture zone in a fully mechanized top coal caving face. The E2311 working face of Gaohe Coal Mine was chosen as the research object, and the combined-strata structure and the rock layer synergistic movement mechanism were determined by combining engineering geological investigation and theoretical analysis. The height of the water-conducting fracture zone at the working face was calculated based on the combined-strata structure, and then the theoretical results were verified by numerical simulation and field measurement. The results show that after the coal seam is extracted from the working face, the movement of the overlying rock layers is in the form of bending and sinking movement of the rock layer group as a unit. Each rock layer group is controlled by a supportive lower layer with greater thickness and strength, driving the upper layers of weaker rock layers to synchronize and coordinate the movement; the sinking curvature is the same, after the lowermost support layer is bent and broken, its overlying weaker rock layers will move and break at the same time. The height of the water-conducting fracture zone of the working face were obtained by theoretical calculation, numerical simulation, and field measurements, which are 83.82 m, 84.3 m, and 86.6 m, respectively. The results are nearly consistent, thus the prediction of the height of the water-conducting fracture zone under the combined-strata structure is more accurate.

Suggested Citation

  • Donghai Jiang & Yinfeng Tang & Wanpeng Huang & Keke Hou & Yi Luo & Jiangwei Liu, 2022. "Research on the Height of the Water-Conducting Fracture Zone in Fully Mechanized Top Coal Caving Face under Combined-Strata Structure," Sustainability, MDPI, vol. 14(21), pages 1-20, October.
  • Handle: RePEc:gam:jsusta:v:14:y:2022:i:21:p:13781-:d:951770
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/14/21/13781/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/14/21/13781/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Krzysztof Skrzypkowski & Krzysztof Zagórski & Anna Zagórska, 2021. "Determination of the Extent of the Rock Destruction Zones around a Gasification Channel on the Basis of Strength Tests of Sandstone and Claystone Samples Heated at High Temperatures up to 1200 °C and ," Energies, MDPI, vol. 14(20), pages 1-27, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ziwei Ding & Shaoyi Wang & Jinglong Liao & Liang Li & Jindui Jia & Qingbao Tang & Xiaofei Li & Chengdeng Gao, 2023. "Reasonable Working-Face Size Based on Full Mining of Overburden Failure," Sustainability, MDPI, vol. 15(4), pages 1-13, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Huichen Xu & Xiaoming Sun & Yong Zhang & Chengwei Zhao & Chengyu Miao & Dong Wang, 2023. "Creep Characteristics of Layered Rock Masses after Water Absorption Due to Structural Effects," IJERPH, MDPI, vol. 20(5), pages 1-18, February.
    2. Marek Laciak & Ján Kačur & Milan Durdán, 2022. "Modeling and Control of Energy Conversion during Underground Coal Gasification Process," Energies, MDPI, vol. 15(7), pages 1-6, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:14:y:2022:i:21:p:13781-:d:951770. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.