IDEAS home Printed from https://ideas.repec.org/a/gam/jsusta/v14y2022i19p11990-d922332.html
   My bibliography  Save this article

Eco-Economic Performance Estimation Method for Pretensioned Spun High-Strength Concrete Pile Installation

Author

Listed:
  • Chang-Yong Yi

    (Intelligent Construction Automation Center, Kyungpook National University, Daegu 41566, Korea)

  • Jin-Young Park

    (Intelligent Construction Automation Center, Kyungpook National University, Daegu 41566, Korea)

  • Chan-Young Park

    (Intelligent Construction Automation Center, Kyungpook National University, Daegu 41566, Korea)

  • Jun-Cheol Lee

    (Department of Architecture, Seowon University, Cheongju 28674, Korea)

  • Young-Jun Park

    (Intelligent Construction Automation Center, Kyungpook National University, Daegu 41566, Korea)

Abstract

Pile installation has an environmental impact through its various processes ranging from raw material extraction to construction. In addition, the environmental performance, productivity, and cost of pile installation depend on the construction plan. Therefore, the chain of activities must be considered when analyzing the sustainability of pile installation. A rational construction plan must carefully examine the factors that affect the productivity and sustainability of pile installations. This study presents a method for evaluating eco-economic performance by analyzing the resource utilization and processes of PHC pile installation. First, a process modeling technique, wherein details are broken down to the work task level, based on energy consumption and resource cost, is proposed. Second, a simulation method that calculates the eco-economic performance of the PHC pile process and resources (e.g., equipment) is presented. Third, a quantitative comparison of durations, costs, and emissions resulting from simulation, estimation based on the CSPR (Construction Standard Production Rate) and IUC (Itemized Unit Cost), site contract, and actual construction is presented. The results reveal that the method effectively reflects the prediction of duration, cost, and carbon emissions generated in the real world during the construction planning stage.

Suggested Citation

  • Chang-Yong Yi & Jin-Young Park & Chan-Young Park & Jun-Cheol Lee & Young-Jun Park, 2022. "Eco-Economic Performance Estimation Method for Pretensioned Spun High-Strength Concrete Pile Installation," Sustainability, MDPI, vol. 14(19), pages 1-17, September.
  • Handle: RePEc:gam:jsusta:v:14:y:2022:i:19:p:11990-:d:922332
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/14/19/11990/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/14/19/11990/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Tarek Zayed & Daniel Halpin, 2005. "Deterministic models for assessing productivity and cost of bored piles," Construction Management and Economics, Taylor & Francis Journals, vol. 23(5), pages 531-543.
    2. Ming Shan & Bon-Gang Hwang & Lei Zhu, 2017. "A Global Review of Sustainable Construction Project Financing: Policies, Practices, and Research Efforts," Sustainability, MDPI, vol. 9(12), pages 1-17, December.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Makarenko, Inna & Serpeninova, Yulia & Pogorila, Kateryna, 2018. "Інституційне Забезпечення Фінансування Сталого Розвитку У Світлі Мультистейкхолдерського Підходу," Agricultural and Resource Economics: International Scientific E-Journal, Agricultural and Resource Economics: International Scientific E-Journal, vol. 4(2), June.
    2. Fatima Afzal & Roksana Jahan Tumpa, 2024. "Exploring Leadership Styles to Foster Sustainability in Construction Projects: A Systematic Literature Review," Sustainability, MDPI, vol. 16(3), pages 1-32, January.
    3. Hannes Thees, 2020. "Towards Local Sustainability of Mega Infrastructure: Reviewing Research on the New Silk Road," Sustainability, MDPI, vol. 12(24), pages 1-35, December.
    4. Asuamah Yeboah, Samuel, 2024. "Catalysts for Change: Government Incentives Driving Sustainable Construction in Developing Countries," MPRA Paper 122480, University Library of Munich, Germany, revised 29 Sep 2024.
    5. Maria Vasilska, 2021. "Characteristics of Strategic Subcontracting Relations of Industrial SMEs," European Journal of Economics and Business Studies Articles, Revistia Research and Publishing, vol. 7, ejes_v7_i.
    6. Hossam H. Mohamed & Ahmed H. Ibrahim & Asmaa A. Soliman, 2021. "Toward Reducing Construction Project Delivery Time under Limited Resources," Sustainability, MDPI, vol. 13(19), pages 1-17, October.
    7. Edeltraud Haselsteiner & Blerta Vula Rizvanolli & Paola Villoria Sáez & Odysseas Kontovourkis, 2021. "Drivers and Barriers Leading to a Successful Paradigm Shift toward Regenerative Neighborhoods," Sustainability, MDPI, vol. 13(9), pages 1-22, May.
    8. Juan David González-Ruiz & Sergio Botero-Botero & Eduardo Duque-Grisales, 2018. "Financial Eco-Innovation as a Mechanism for Fostering the Development of Sustainable Infrastructure Systems," Sustainability, MDPI, vol. 10(12), pages 1-19, November.
    9. Easthope, Hazel & Palmer, Jasmine & Sharam, Andrea & Nethercote, Megan & Pignatta, Gloria & Crommelin, Laura, 2023. "Delivering sustainable apartment housing: New build and retrofit," SocArXiv z6yn4, Center for Open Science.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:14:y:2022:i:19:p:11990-:d:922332. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.