Author
Listed:
- Mandy Wallace
(People and Places Solutions, Transportation, Jacobs UK Ltd., Glasgow G2 7HX, UK
Department of Civil Engineering and Environment, School of Computing, Engineering and Built Environment, Glasgow Caledonian University, Glasgow G4 0BA, UK)
- Anita Meldrum
(Department of Civil Engineering and Environment, School of Computing, Engineering and Built Environment, Glasgow Caledonian University, Glasgow G4 0BA, UK)
- Slobodan Mickovski
(Department of Civil Engineering and Environment, School of Computing, Engineering and Built Environment, Glasgow Caledonian University, Glasgow G4 0BA, UK)
- Iain McNee
(People and Places Solutions, Transportation, Jacobs UK Ltd., Glasgow G2 7HX, UK)
- Derwyn Lear
(Formerly Jacobs UK Ltd., Glasgow G2 7HX, UK)
- Sam Flint
(Formerly Jacobs UK Ltd., Glasgow G2 7HX, UK)
Abstract
Silt pollution generated during major highway construction projects can prove detrimental to the water environment and the aquatic species that depend on it. Construction activities can leave many kilometers of exposed soil susceptible to erosion from surface water runoff, which can result in silt pollution and degradation of ecologically sensitive watercourses if appropriate mitigation is not in place. In Scotland, assurances need to be provided during scheme development to demonstrate that there is sufficient space to accommodate temporary drainage. In response, a methodological framework has been developed that can be applied before construction commences to estimate the required capacity of settlement ponds including runoff and soil loss volume estimation, which are estimated using the Rational Method and Revised Universal Soil Loss Equation (RUSLE). The application of the framework as a case-study has demonstrated the potential applicability of the approach and highlighted where further refinements can be made to increase the robustness for future applications by improving the accuracy of input parameters to address site-specific conditions. Furthermore, it demonstrates how adopting erosion control measures can reduce the land required to accommodate temporary settlement ponds.
Suggested Citation
Mandy Wallace & Anita Meldrum & Slobodan Mickovski & Iain McNee & Derwyn Lear & Sam Flint, 2020.
"Developing a Methodological Framework for Estimating Temporary Drainage Capacity to Inform Land Requirements for a Highway Construction Project in Scotland,"
Sustainability, MDPI, vol. 12(14), pages 1-17, July.
Handle:
RePEc:gam:jsusta:v:12:y:2020:i:14:p:5522-:d:381946
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:12:y:2020:i:14:p:5522-:d:381946. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.