IDEAS home Printed from https://ideas.repec.org/a/gam/jsusta/v10y2018i6p1807-d149784.html
   My bibliography  Save this article

Layout Optimization Model for the Production Planning of Precast Concrete Building Components

Author

Listed:
  • Dong Wang

    (School of Construction Management and Real Estate, Chongqing University, Chongqing 400044, China)

  • Guiwen Liu

    (School of Construction Management and Real Estate, Chongqing University, Chongqing 400044, China)

  • Kaijian Li

    (School of Construction Management and Real Estate, Chongqing University, Chongqing 400044, China
    Postdoctoral Station of Urban and Rural Planning, Chongqing University, Chongqing 400044, China)

  • Tongjing Wang

    (Key Laboratory of Road and Traffic Engineering of the Ministry of Education, Tongji University, Shanghai 20092, China)

  • Asheem Shrestha

    (School of Architecture and Construction Management, Deakin University, Geelong, VIC 3220, Australia)

  • Igor Martek

    (School of Architecture and Construction Management, Deakin University, Geelong, VIC 3220, Australia)

  • Xiaobo Tao

    (School of Economics and Management, North China University of Technology, Beijing 100144, China)

Abstract

Precast concrete comprises the basic components of modular buildings. The efficiency of precast concrete building component production directly impacts the construction time and cost. In the processes of precast component production, mold setting has a significant influence on the production efficiency and cost, as well as reducing the resource consumption. However, the development of mold setting plans is left to the experience of production staff, with outcomes dependent on the quality of human skill and experience available. This can result in sub-optimal production efficiencies and resource wastage. Accordingly, in order to improve the efficiency of precast component production, this paper proposes an optimization model able to maximize the average utilization rate of pallets used during the molding process. The constraints considered were the order demand, the size of the pallet, layout methods, and the positional relationship of components. A heuristic algorithm was used to identify optimization solutions provided by the model. Through empirical analysis, and as exemplified in the case study, this research is significant in offering a prefabrication production planning model which improves pallet utilization rates, shortens component production time, reduces production costs, and improves the resource utilization. The results clearly demonstrate that the proposed method can facilitate the precast production plan providing strong practical implications for production planners.

Suggested Citation

  • Dong Wang & Guiwen Liu & Kaijian Li & Tongjing Wang & Asheem Shrestha & Igor Martek & Xiaobo Tao, 2018. "Layout Optimization Model for the Production Planning of Precast Concrete Building Components," Sustainability, MDPI, vol. 10(6), pages 1-16, May.
  • Handle: RePEc:gam:jsusta:v:10:y:2018:i:6:p:1807-:d:149784
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/10/6/1807/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/10/6/1807/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Vacharapoom Benjaoran & Nashwan Dawood & Brian Hobbs, 2005. "Flowshop scheduling model for bespoke precast concrete production planning," Construction Management and Economics, Taylor & Francis Journals, vol. 23(1), pages 93-105.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Kennedy A. G. Araújo & Tibérius O. Bonates & Bruno A. Prata & Anselmo R. Pitombeira-Neto, 2021. "Heterogeneous prestressed precast beams multiperiod production planning problem: modeling and solution methods," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 29(3), pages 660-693, October.
    2. Alasdair Reid, 2023. "Closing the Affordable Housing Gap: Identifying the Barriers Hindering the Sustainable Design and Construction of Affordable Homes," Sustainability, MDPI, vol. 15(11), pages 1-27, May.
    3. Daniel Wałach & Aleksandra Mach, 2023. "Effect of Concrete Mix Composition on Greenhouse Gas Emissions over the Full Life Cycle of a Structure," Energies, MDPI, vol. 16(7), pages 1-20, April.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Kennedy A. G. Araújo & Tibérius O. Bonates & Bruno A. Prata & Anselmo R. Pitombeira-Neto, 2021. "Heterogeneous prestressed precast beams multiperiod production planning problem: modeling and solution methods," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 29(3), pages 660-693, October.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:10:y:2018:i:6:p:1807-:d:149784. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.