Reasonable Paths of Construction Ventilation for Large-Scale Underground Cavern Groups in Winter and Summer

Author

Listed:
  • Jianchun Sun

    (Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, School of civil Engineering, Southwest Jiaotong University, Chengdu 610031, China)

  • Heng Zhang

    (Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, School of civil Engineering, Southwest Jiaotong University, Chengdu 610031, China
    School of Engineering, University of Warwick, Coventry CV4 7AL, UK)

  • Muyan Huang

    (Institute of Foreign Languages, Sichuan Technology and Business University, Meishan 620000, China)

  • Qianyang Chen

    (Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, School of civil Engineering, Southwest Jiaotong University, Chengdu 610031, China)

  • Shougen Chen

    (Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, School of civil Engineering, Southwest Jiaotong University, Chengdu 610031, China)

Abstract

Forced ventilation or newly built vertical shafts are mainly used to solve ventilation problems in large underground cavern groups. However, it is impossible to increase air supply due to the size restriction of the construction roadway, resulting in ventilation deterioration. Based on construction of the Jinzhou underground oil storage project, we proposed both a summer ventilation scheme and winter ventilation scheme, after upper layer excavation of the cavern is completed and connected with the shaft. A three-dimensional numerical model validated with field test data was performed to investigate air velocity and CO concentration. Fan position optimization and the influence of temperature difference on natural ventilation were discussed. The results show that CO concentration in the working area of the cavern can basically drop to a safe value of 30 mg/m 3 in air inlet and exhaust schemes after 10 min of ventilation. Since there is inevitably a back-flow in the winter ventilation scheme, it is necessary to ensure that airflow is always moving towards the shaft. Optimal placement of the axial flow fan at the shaft bottom is on the central axis of the cavern, 5 m away from the shaft. The greater the temperature difference, the better the natural ventilation effect of the shaft. The natural ventilation effect of the shaft as an outlet in winter, is better than that of the shaft as an inlet in summer.

Suggested Citation

  • Jianchun Sun & Heng Zhang & Muyan Huang & Qianyang Chen & Shougen Chen, 2018. "Reasonable Paths of Construction Ventilation for Large-Scale Underground Cavern Groups in Winter and Summer," Sustainability, MDPI, vol. 10(10), pages 1-15, October.
  • Handle: RePEc:gam:jsusta:v:10:y:2018:i:10:p:3768-:d:176683
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/10/10/3768/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/10/10/3768/
    Download Restriction: no
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:10:y:2018:i:10:p:3768-:d:176683. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.