Author
Listed:
- Abumalé Cruz-Salomón
(Faculty of Engineering, University of Science and Arts of Chiapas, Libramiento Norte Poniente No. 1150, Lajas Maciel, Tuxtla Gutiérrez C.P. 29039, Mexico)
- Edna Ríos-Valdovinos
(Faculty of Engineering, University of Science and Arts of Chiapas, Libramiento Norte Poniente No. 1150, Lajas Maciel, Tuxtla Gutiérrez C.P. 29039, Mexico)
- Francisco Pola-Albores
(Center for Research and Technological Development in Renewal Energies, University of Science and Arts of Chiapas, Libramiento Norte Poniente 1150, Lajas Maciel, Tuxtla Gutiérrez C.P. 29039, Mexico)
- Selene Lagunas-Rivera
(Professor CONACYT, Department of Chemical and Biochemistry Engineering, National Institute of Technology of Mexico-Tuxtla Gutiérrez Institute of Technology, Carretera Panamericana Km 1080, Tuxtla Gutiérrez C.P. 29050, Mexico)
- Rocío Meza-Gordillo
(Department of Chemical and Biochemistry Engineering, National Institute of Technology of Mexico-Tuxtla Gutiérrez Institute of Technology, Carretera Panamericana Km 1080, Tuxtla Gutiérrez C.P. 29050, Mexico)
- Víctor M. Ruíz-Valdiviezo
(Department of Chemical and Biochemistry Engineering, National Institute of Technology of Mexico-Tuxtla Gutiérrez Institute of Technology, Carretera Panamericana Km 1080, Tuxtla Gutiérrez C.P. 29050, Mexico)
Abstract
The coffee processing agro-industry generates large quantities of wastewater requiring systematic treatment prior to disposal. For this reason, the aim of this study was to evaluate the hydraulic retention times (HRT) in treatment of coffee processing wastewater (CPWW) using a laboratory scale Expanded Granular Sludge Bed (EGSB) bioreactor at different HRT (3 to 9 days). The EGSB was evaluated in mesophilic condition (26 ± 2 °C) with an average pH of 7.5 ± 0.2 to determine the chemical oxygen demand (COD) removal efficiency. According to the results, the COD removal efficiency increases from 94 to 98% when the HRT increase from 3 to 9 days; the α factor remained stable (0.98) throughout the evolution of the bioreactor. The HRT´s between 7–9 days generated effluents capable to be dischargeable into water bodies with a permitted COD concentration according to World Health Organization (WHO) and Official Mexican Environmental Regulations permissible limits. Results evidenced that the HRT of 9 days was the one that greater COD removal generated, so the EGSB bioreactor can be a sustainable alternative to solve the environmental problems, compared to other conventional methods to CPWW treatment.
Suggested Citation
Abumalé Cruz-Salomón & Edna Ríos-Valdovinos & Francisco Pola-Albores & Selene Lagunas-Rivera & Rocío Meza-Gordillo & Víctor M. Ruíz-Valdiviezo, 2017.
"Evaluation of Hydraulic Retention Time on Treatment of Coffee Processing Wastewater (CPWW) in EGSB Bioreactor,"
Sustainability, MDPI, vol. 10(1), pages 1-11, December.
Handle:
RePEc:gam:jsusta:v:10:y:2017:i:1:p:83-:d:124872
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:10:y:2017:i:1:p:83-:d:124872. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.