IDEAS home Printed from https://ideas.repec.org/a/gam/jresou/v14y2025i4p53-d1620026.html
   My bibliography  Save this article

Development of a Quantitative Assessment Algorithm for Operational Risks in Mining Engineering

Author

Listed:
  • Marina Nevskaya

    (Department of Organization and Management, St. Petersburg Mining University of Empress Catherine II, 199106 St. Petersburg, Russia)

  • Anna Shabalova

    (Department of Organization and Management, St. Petersburg Mining University of Empress Catherine II, 199106 St. Petersburg, Russia)

  • Liubov Nikolaichuk

    (Educational Centre for Digital Technologies, St. Petersburg Mining University of Empress Catherine II, 199106 St. Petersburg, Russia)

  • Natalya Kirsanova

    (Department of Economic Theory, St. Petersburg Mining University of Empress Catherine II, 199106 St. Petersburg, Russia)

Abstract

Whenever any type of ore deposit is developed, it comes with significant risks, such as uncertain reserves, harsh climate conditions, and other uncontrollable factors. To manage these risks effectively, companies need to quickly adapt to changing conditions. This paper presents a method for evaluating risks using a simulation model. The main objective is to identify factors of operational risk and determine the project parameters that have the greatest impact on the probability of a risk event. The method includes the classification of operational risks based on the way they arise; the creation of a risk decomposition matrix dividing risks by production tasks; and the construction of a mathematical model using the identified risk factors. The method was tested by developing a simulation model of an underground mine conveyor network in Anylogic (8.9.2) software. A simulation experiment showed that conveyor shutdowns could result in an 11.23% reduction in annual revenue. Based on the results, recommendations were made on how these risks can be reduced and on the need to implement a transport system to increase resilience.

Suggested Citation

  • Marina Nevskaya & Anna Shabalova & Liubov Nikolaichuk & Natalya Kirsanova, 2025. "Development of a Quantitative Assessment Algorithm for Operational Risks in Mining Engineering," Resources, MDPI, vol. 14(4), pages 1-14, March.
  • Handle: RePEc:gam:jresou:v:14:y:2025:i:4:p:53-:d:1620026
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2079-9276/14/4/53/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2079-9276/14/4/53/
    Download Restriction: no
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jresou:v:14:y:2025:i:4:p:53-:d:1620026. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.