Author
Listed:
- Nilthon Arce Fernández
(Academic Department of Basic and Applied Sciences, Universidad Nacional de Jaén, Jaén 06800, Peru)
- Flabio Gutiérrez Segura
(Mathematics Department, Faculty of Science, Universidad Nacional de Piura, Castilla, Piura 20002, Peru)
- Manuel Emilio Milla Pino
(Department of Civil Engineering, Faculty of Engineering, Universidad Nacional de Jaén, Jaén 06800, Peru)
- Jose Manuel Palomino Ojeda
(Data Science Research Institute, Universidad Nacional de Jaén, Jaén 06800, Peru)
- Alfredo Lázaro Ludeña Gutiérrez
(Research Office, Universidad Nacional de Jaén, Jaén 06800, Peru)
- River Chávez Santos
(Academic Department of Education, Communication Sciences and Basic Sciences, Faculty of Education and Communication Sciences, Universidad Nacional Toribio Rodríguez de Mendoza de Amazonas, Chachapoyas 01001, Peru)
Abstract
Scheduling for a construction project with a limited number of machines is a critical and well-studied problem. Most studies assume that task processing times are exact; in practice, delays frequently occur, rendering the initial work plan invalid. Therefore, adaptability is crucial to the success of a project. This work introduces a fuzzy optimization model for the planning of construction projects executed simultaneously and having only one backhoe. The model assumes imprecise task processing times, represented by triangular fuzzy sets, that accept delays up to a permitted degree of tolerance. The model solution obtains a fuzzy work plan. This is a robust plan that supports incidents (delays). A method to apply the model was created. The fuzzy model can help construction companies reduce delays in the delivery of their projects and avoid excessive penalties. The model was implemented in the CPLEX solver, which can quickly obtain an optimal solution for small and medium instances. For large instances, the model must be solved with metaheuristics. This scientific contribution is important for future work since it consists of the application of fuzzy optimization in a specific area of civil engineering.
Suggested Citation
Nilthon Arce Fernández & Flabio Gutiérrez Segura & Manuel Emilio Milla Pino & Jose Manuel Palomino Ojeda & Alfredo Lázaro Ludeña Gutiérrez & River Chávez Santos, 2024.
"Fuzzy Optimization Model for Decision-Making in Single Machine Construction Project Planning,"
Mathematics, MDPI, vol. 12(7), pages 1-18, April.
Handle:
RePEc:gam:jmathe:v:12:y:2024:i:7:p:1088-:d:1369944
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jmathe:v:12:y:2024:i:7:p:1088-:d:1369944. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.