IDEAS home Printed from https://ideas.repec.org/a/gam/jmathe/v12y2024i19p3129-d1493246.html
   My bibliography  Save this article

Developing a Robust Multi-Skill, Multi-Mode Resource-Constrained Project Scheduling Model with Partial Preemption, Resource Leveling, and Time Windows

Author

Listed:
  • Ladan Hatami-Moghaddam

    (Department of Industrial Engineering, Science and Research Branch, Islamic Azad University, Tehran 1477893855, Iran)

  • Mohammad Khalilzadeh

    (Department of Industrial Engineering, Science and Research Branch, Islamic Azad University, Tehran 1477893855, Iran)

  • Nasser Shahsavari-Pour

    (Department of Industrial Engineering, Vali-e-Asr University, Rafsanjan 7718897111, Iran)

  • Seyed Mojtaba Sajadi

    (Operations and Information Management Department, Aston Business School, Aston University, Birmingham B4 7ET, UK)

Abstract

Real-world projects encounter numerous issues, challenges, and assumptions that lead to changes in scheduling. This exposure has prompted researchers to develop new scheduling models, such as those addressing constrained resources, multi-skill resources, and activity pre-emption. Constrained resources arise from competition among projects for limited access to renewable resources. This research presents a scheduling model with constrained multi-skill and multi-mode resources, where activity durations vary under different scenarios and allow for partial pre-emption due to resource shortages. The main innovation is the pre-emption of activities when resources are unavailable, with defined minimum and maximum delivery time windows. For this purpose, a multi-objective mathematical programming model is developed that considers Bertsimas and Sim’s robust model in uncertain conditions. The model aims to minimize resource consumption, idleness, and project duration. The proposed model was solved using a multi-objective genetic algorithm and finally, its validation was completed and confirmed. Analysis shows that limited renewable resources can lead to increased activity pre-emption and extended project timelines. Additionally, higher demand raises resource consumption, reducing availability and prolonging project duration. Increasing the upper time window extends project time while decreasing the lower bound pressures resources, leading to higher consumption and resource scarcity.

Suggested Citation

  • Ladan Hatami-Moghaddam & Mohammad Khalilzadeh & Nasser Shahsavari-Pour & Seyed Mojtaba Sajadi, 2024. "Developing a Robust Multi-Skill, Multi-Mode Resource-Constrained Project Scheduling Model with Partial Preemption, Resource Leveling, and Time Windows," Mathematics, MDPI, vol. 12(19), pages 1-21, October.
  • Handle: RePEc:gam:jmathe:v:12:y:2024:i:19:p:3129-:d:1493246
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2227-7390/12/19/3129/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2227-7390/12/19/3129/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Snauwaert, Jakob & Vanhoucke, Mario, 2023. "A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 307(1), pages 1-19.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Rahman Torba & Stéphane Dauzère-Pérès & Claude Yugma & Cédric Gallais & Juliette Pouzet, 2024. "Solving a real-life multi-skill resource-constrained multi-project scheduling problem," Annals of Operations Research, Springer, vol. 338(1), pages 69-114, July.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jmathe:v:12:y:2024:i:19:p:3129-:d:1493246. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.