Author
Listed:
- Lei Gu
(Institute of Systems Engineering, Macau University of Science and Technology, Taipa, Macao 999078, China
Department of Engineering Science, Faculty of Innovation Engineering, Macau University of Science and Technology, Taipa, Macao 999078, China)
- Naiqi Wu
(Institute of Systems Engineering, Macau University of Science and Technology, Taipa, Macao 999078, China
Department of Engineering Science, Faculty of Innovation Engineering, Macau University of Science and Technology, Taipa, Macao 999078, China)
- Tan Li
(Institute of Systems Engineering, Macau University of Science and Technology, Taipa, Macao 999078, China
Department of Engineering Science, Faculty of Innovation Engineering, Macau University of Science and Technology, Taipa, Macao 999078, China)
- Siwei Zhang
(Institute of Systems Engineering, Macau University of Science and Technology, Taipa, Macao 999078, China
Department of Engineering Science, Faculty of Innovation Engineering, Macau University of Science and Technology, Taipa, Macao 999078, China)
- Wenyu Wu
(Institute of Systems Engineering, Macau University of Science and Technology, Taipa, Macao 999078, China
Department of Engineering Science, Faculty of Innovation Engineering, Macau University of Science and Technology, Taipa, Macao 999078, China)
Abstract
In order to improve quality assurance in wafer manufacturing, there are strict process requirements. Besides the well-known residency time constraints (RTCs), a dual-arm cluster tool also requires each robot arm to execute a specific set of tasks. We call such a tool an arm task-constrained dual-arm cluster tool (ATC-DACT). To do this, one of the arms is identified as the dirty one and the other as the clean one. The dirty one can deal with raw wafers, while the clean one can deal with processed wafers. This requirement raises a new problem for scheduling a cluster tool. This paper discusses the scheduling problem of ATC-DACTs with RTCs. Due to the arm task constraints, the proven, effective swap strategy is no longer applicable to ATC-DACTs, making the scheduling problem difficult. To address this problem, we explicitly describe the robot waiting as an event and build a Petri net (PN) model. Then, we propose a hybrid task sequence (HTS) as an operation strategy by combining the swap and backward strategies. Based on the HTS, the necessary and sufficient conditions for schedulability are established; also, a linear programming model is developed. We then develop an algorithm using these results to optimally schedule the system. Industrial case studies demonstrate the application of this method.
Suggested Citation
Lei Gu & Naiqi Wu & Tan Li & Siwei Zhang & Wenyu Wu, 2024.
"Periodic Scheduling Optimization for Dual-Arm Cluster Tools with Arm Task and Residency Time Constraints via Petri Net Model,"
Mathematics, MDPI, vol. 12(18), pages 1-21, September.
Handle:
RePEc:gam:jmathe:v:12:y:2024:i:18:p:2912-:d:1481098
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jmathe:v:12:y:2024:i:18:p:2912-:d:1481098. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.