Author
Listed:
- Sung-Neng Peng
(Department of Industrial Engineering and Management, National Taipei University of Technology, Taipei 106, Taiwan)
- Chien-Yi Huang
(Department of Industrial Engineering and Management, National Taipei University of Technology, Taipei 106, Taiwan)
- Hwa-Dong Liu
(Undergraduate Program of Vehicle and Energy Engineering, National Taiwan Normal University, Taipei 106, Taiwan)
Abstract
Taipei mass rapid transit (MRT), operational since 1996, serves up to two million passengers daily. Equipment malfunctions pose a safety risk, making the dual goals of cost reduction and safety a significant challenge. Recently, outsourcing non-core technical tasks has emerged as an effective cost-control strategy, allowing resource allocation to employee salaries and operational efficiency. This study uses the analytic hierarchy process (AHP) and fuzzy analytic hierarchy process (FAHP) to prioritize outsourcing for electromechanical equipment. It incorporates analysis from the outsourcing literature, historical data, and ISO documents from Taipei MRT. The research included interviews and surveys with seven senior managers, using software to analyze the outsourcing priorities of four key systems: electrical and fire safety, environmental air conditioning, escalators and elevators, and power supply. It suggests prioritizing environmental air conditioning, followed by power supply systems, escalators and elevators, and electrical and fire safety systems. Additionally, this study employed the FAHP and the technique for order of preference by similarity to ideal solution (TOPSIS) for the rigorous evaluation and monitoring of vendor selection to ensure quality service and effective contract execution. By comparing technical expertise, problem-solving capabilities, certifications, response times, and contractual performance, this study identified the most suitable vendors. It concludes with recommendations for Taipei MRT to enhance maintenance quality and reduce costs.
Suggested Citation
Sung-Neng Peng & Chien-Yi Huang & Hwa-Dong Liu, 2024.
"Hybrid Management Strategy for Outsourcing Electromechanical Maintenance and Selecting Contractors in Taipei MRT,"
Mathematics, MDPI, vol. 12(14), pages 1-18, July.
Handle:
RePEc:gam:jmathe:v:12:y:2024:i:14:p:2192-:d:1434016
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jmathe:v:12:y:2024:i:14:p:2192-:d:1434016. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.