IDEAS home Printed from https://ideas.repec.org/a/gam/jijerp/v19y2022i23p15471-d980652.html
   My bibliography  Save this article

Fault Diagnosis and Maintenance Countermeasures of Transverse Drainage Pipe in Subway Tunnel Based on Fault Tree Analysis

Author

Listed:
  • Shiyang Liu

    (College of Civil Engineering, Chongqing Jiaotong University, Chongqing 400074, China
    State Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University, Chongqing 400074, China)

  • Xuefu Zhang

    (College of Civil Engineering, Chongqing Jiaotong University, Chongqing 400074, China
    State Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University, Chongqing 400074, China)

Abstract

Transverse drainage pipe, one of the main channels of groundwater behind the lining of subway tunnels, plays an important role in the safety and stability of the tunnel lining structure. For the problem of blocked transverse drainage pipe in a subway tunnel, a fault tree model of blocked transverse drainage pipe in Chongqing subway tunnel was constructed in this paper, the quantitative and qualitative analysis of fault tree was conducted, and countermeasures for maintenance of transverse drainage pipe were proposed. The study finds that, (1) the chemical type of groundwater was mainly CaHCO 3 ; most of the groundwater is strongly alkaline with pH greater than 8; the groundwater temperature is 20 ± 3 °C; (2) the basic events of blocked transverse drainage pipe have 3 minimum cut sets, and the basic events concrete slurry enters the drainage pipe; groundwater temperature, groundwater pH value, and concentration of anions and cations in groundwater were the main fault factors of blocked transverse drainage pipe; (3) preventive maintenance of transverse drainage pipe during tunnel construction includes construction quality control of drainage pipe and application of anti-crystallized blocking drainage pipe; preventive maintenance of transverse drainage pipe during tunnel operation includes monitoring of groundwater ion concentration, pH, and temperature; and maintenance treatment of transverse drainage pipe during tunnel operation includes physical treatment techniques, such as ultrasonic resonance, and chemical treatment techniques, such as acid-base neutralization reaction. The results of the study have certain guiding significance for the design, construction, and operation of transverse drainage pipe in subway tunnels.

Suggested Citation

  • Shiyang Liu & Xuefu Zhang, 2022. "Fault Diagnosis and Maintenance Countermeasures of Transverse Drainage Pipe in Subway Tunnel Based on Fault Tree Analysis," IJERPH, MDPI, vol. 19(23), pages 1-24, November.
  • Handle: RePEc:gam:jijerp:v:19:y:2022:i:23:p:15471-:d:980652
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/1660-4601/19/23/15471/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/1660-4601/19/23/15471/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Xiaobing Ding & Qiuyu Huang & Haiyan Zhu & Hua Hu & Zhigang Liu, 2017. "Subway Tunnel Disease Associations Mining Based on Fault Tree Analysis Algorithm," Mathematical Problems in Engineering, Hindawi, vol. 2017, pages 1-7, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Zhenxing Wang & Yunjun Yu & Kallol Roy & Cheng Gao & Lei Huang, 2023. "The Application of Machine Learning: Controlling the Preparation of Environmental Materials and Carbon Neutrality," IJERPH, MDPI, vol. 20(3), pages 1-4, January.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.

      Corrections

      All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jijerp:v:19:y:2022:i:23:p:15471-:d:980652. See general information about how to correct material in RePEc.

      If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

      If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

      If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

      For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

      Please note that corrections may take a couple of weeks to filter through the various RePEc services.

      IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.