IDEAS home Printed from https://ideas.repec.org/a/gam/jftint/v9y2017i1p5-d90002.html
   My bibliography  Save this article

Construction Management Risk System (CMRS) for Construction Management (CM) Firms

Author

Listed:
  • Kyungmo Park

    (Innovation Durable Building and Infrastructure Research Center, Hanyang University ERICA Campus, 55 Hanyangdaehak-ro, Sannok-gu, Ansan-si, Gyeonggi-do 15588, Korea)

  • Sanghyo Lee

    (Innovation Durable Building and Infrastructure Research Center, Hanyang University ERICA Campus, 55 Hanyangdaehak-ro, Sannok-gu, Ansan-si, Gyeonggi-do 15588, Korea)

  • Yonghan Ahn

    (School of Architecture and Architectural Engineering, Hanyang University ERICA Campus, 55 Hanyangdaehak-ro, Sangrok-gu, Ansan-si, Gyeonggi-do 15588, Korea)

Abstract

After the global financial crisis of 2008, the need for risk management arose because it was necessary to minimize the losses in construction management (CM) firms. This was caused by a decreased amount of orders in the Korean CM market, which intensified order competition between companies. However, research results revealed that risks were not being systematically managed owing to the absence of risk management systems. Thus, it was concluded that it was necessary to develop standard operating systems and implement risk management systems in order to manage risks effectively. Therefore, the purpose of this study was to develop a construction risk management system (CRMS) for systematically managing risks. For this purpose, the field operation managers of CM firms were interviewed and surveyed in order to define risk factors. Upon this, a risk assessment priority analysis was performed. Finally, a risk management system that comprised seven modules and 20 sub-modules and was capable of responding systematically to risks was proposed. Furthermore, the effectiveness of this system was verified through on-site inspection. This system allows early response to risks, accountability verification and immediate response to legal disputes with clients by managing risk records.

Suggested Citation

  • Kyungmo Park & Sanghyo Lee & Yonghan Ahn, 2017. "Construction Management Risk System (CMRS) for Construction Management (CM) Firms," Future Internet, MDPI, vol. 9(1), pages 1-20, February.
  • Handle: RePEc:gam:jftint:v:9:y:2017:i:1:p:5-:d:90002
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/1999-5903/9/1/5/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/1999-5903/9/1/5/
    Download Restriction: no
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jftint:v:9:y:2017:i:1:p:5-:d:90002. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.