IDEAS home Printed from https://ideas.repec.org/a/gam/jeners/v17y2024i21p5508-d1513566.html
   My bibliography  Save this article

Two-Stage Locating and Capacity Optimization Model for the Ultra-High-Voltage DC Receiving End Considering Carbon Emission Trading and Renewable Energy Time-Series Output Reconstruction

Author

Listed:
  • Lang Zhao

    (State Grid Economic and Technological Research Institute Co., Ltd., Beijing 102209, China
    Key Laboratory of Smart Grid of Ministry of Education, Tianjin University, Tianjin 300072, China)

  • Zhidong Wang

    (State Grid Economic and Technological Research Institute Co., Ltd., Beijing 102209, China)

  • Hao Sheng

    (Key Laboratory of Smart Grid of Ministry of Education, Tianjin University, Tianjin 300072, China)

  • Yizheng Li

    (State Grid Economic and Technological Research Institute Co., Ltd., Beijing 102209, China)

  • Tianqi Zhang

    (State Grid Economic and Technological Research Institute Co., Ltd., Beijing 102209, China)

  • Yao Wang

    (Economic and Technological Research Institute of State Grid Shanxi Electric Power Co., Ltd., Taiyuan 030021, China)

  • Haifeng Yu

    (Economic and Technological Research Institute of State Grid Hunan Electric Power Co., Ltd., Changsha 030021, China)

Abstract

With the load center’s continuous expansion and development of the AC power grid’s scale and construction, the recipient grid under the multi-feed DC environment is facing severe challenges of DC commutation failure and bipolar blocking due to the high strength of AC-DC coupling and the low level of system inertia, which brings many complexities and uncertainties to economic scheduling. In addition, the large-scale grid integration of wind power, photovoltaic, and other intermittent energy sources makes the ultra-high-voltage (UHV) DC channel operation state randomized. The deterministic scenario-based timing power simulation is no longer suitable for the current complex and changeable grid operation state. In this paper, we first start with the description and analysis of the uncertainty in renewable energy (RE) sources, such as wind and solar, and reconstruct the time-sequence power model by using the stochastic differential equation model. Then, a carbon emission trading cost (CET) model is constructed based on the CET mechanism, and the two-stage locating and capacity optimization model for the UHV DC receiving end is proposed under the constraint of dispatch safety and stability. Among them, the first stage starts with the objective of maximizing the carrying capacity of the UHV DC receiving end grid; the second stage checks its dynamic safety under the basic and fault modes according to the results of the first stage and corrects the drop point and capacity of the UHV DC line with the objective of achieving safe and stable UHV DC operation at the lowest economic investment. In addition, the two-stage model innovatively proposes UHV DC relative inertia constraints, peak adjustment margin constraints, transient voltage support constraints under commutation failure conditions, and frequency support constraints under a DC blocking state. In addition, to address the problem that the probabilistic constraints of the scheduling model are difficult to solve, the discrete step-size transformation and convolution sequence operation methods are proposed to transform the chance-constrained planning into mixed-integer linear planning for solving. Finally, the proposed model is validated with a UHV DC channel in 2023, and the results confirm the feasibility and effectiveness of the model.

Suggested Citation

  • Lang Zhao & Zhidong Wang & Hao Sheng & Yizheng Li & Tianqi Zhang & Yao Wang & Haifeng Yu, 2024. "Two-Stage Locating and Capacity Optimization Model for the Ultra-High-Voltage DC Receiving End Considering Carbon Emission Trading and Renewable Energy Time-Series Output Reconstruction," Energies, MDPI, vol. 17(21), pages 1-29, November.
  • Handle: RePEc:gam:jeners:v:17:y:2024:i:21:p:5508-:d:1513566
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/1996-1073/17/21/5508/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/1996-1073/17/21/5508/
    Download Restriction: no
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:17:y:2024:i:21:p:5508-:d:1513566. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.