IDEAS home Printed from https://ideas.repec.org/a/gam/jeners/v16y2023i4p1952-d1070092.html
   My bibliography  Save this article

Model for Predicting Horizontal Well Transient Productivity in the Bottom-Water Reservoir with Finite Water Bodies

Author

Listed:
  • Xiaofei Jia

    (School of Petroleum Engineering, China University of Petroleum (East China), Qingdao 266580, China
    China National Offshore Oil Corporation, China Limited, Tianjin Branch, Tianjin 300459, China)

  • Zhaobo Sun

    (China National Offshore Oil Corporation, International Limited, Beijing 100029, China)

  • Guanglun Lei

    (School of Petroleum Engineering, China University of Petroleum (East China), Qingdao 266580, China
    Key Laboratory of Unconventional Oil & Gas Development (China University of Petroleum (East China)), Ministry of Education, Qingdao 266580, China)

  • Chuanjin Yao

    (School of Petroleum Engineering, China University of Petroleum (East China), Qingdao 266580, China
    Key Laboratory of Unconventional Oil & Gas Development (China University of Petroleum (East China)), Ministry of Education, Qingdao 266580, China)

Abstract

To better understand the horizontal well transient productivity in the bottom-water reservoir with finite water bodies, the horizontal well transient productivity model for the bottom-water reservoir with finite water-body multiple was developed using Green’s function and potential superposition method. Laplace transforms, Fourier transforms, superposition of point source, and Duhamel principle were used to obtain the transient productivity of the horizontal well, and the transient productivity of the horizontal well in real space was obtained by the Stehfest numerical inversion method. The typical pressure response curve and dimensionless productivity curves were plotted. The effects of the water-body multiple, the distance between the horizontal well and oil–water contact, and the skin factor, were analyzed. Six main flowing stages were divided for horizontal wells in the bottom-water reservoir with finite water bodies. When the water body multiples are zero or tend to infinity, the results obtained from the model are consistent with the calculations by the conventional top-bottom closed reservoir model or infinite rigid bottom-water reservoir model, respectively, and the pressure dynamic for the finite water body falls in between both. With the increase in the water body multiples and the decrease in distance between the horizontal well and the oil–water contact, and the horizontal well productivity decreases slowly. With the increase in the skin factor, the initial productivity decreases; moreover, the skin factor has a great influence on the initial productivity of the horizontal well, while the later influence gradually decreases. Accurate horizontal well productivity prediction in the bottom-water reservoir with finite water bodies provides a strong basis for horizontal well deployment, design optimization, and formulation of development policy.

Suggested Citation

  • Xiaofei Jia & Zhaobo Sun & Guanglun Lei & Chuanjin Yao, 2023. "Model for Predicting Horizontal Well Transient Productivity in the Bottom-Water Reservoir with Finite Water Bodies," Energies, MDPI, vol. 16(4), pages 1-13, February.
  • Handle: RePEc:gam:jeners:v:16:y:2023:i:4:p:1952-:d:1070092
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/1996-1073/16/4/1952/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/1996-1073/16/4/1952/
    Download Restriction: no
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Dagui Liu & Weiqing Wang & Huie Zhang & Wei Shi & Caiqing Bai & Huimin Zhang, 2023. "Day-Ahead and Intra-Day Optimal Scheduling Considering Wind Power Forecasting Errors," Sustainability, MDPI, vol. 15(14), pages 1-17, July.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:16:y:2023:i:4:p:1952-:d:1070092. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.