IDEAS home Printed from https://ideas.repec.org/a/gam/jeners/v16y2023i23p7887-d1293010.html
   My bibliography  Save this article

Stability Control Technology for Surrounding Rocks in Gob-Side Entry Driving with Small Coal Pillars under Dynamic Pressure

Author

Listed:
  • Shihao Guo

    (College of Energy and Mining Engineering, Shandong University of Science and Technology, Qingdao 266590, China)

  • Shanchao Hu

    (College of Energy and Mining Engineering, Shandong University of Science and Technology, Qingdao 266590, China)

  • Junhong Huang

    (College of Energy and Mining Engineering, Shandong University of Science and Technology, Qingdao 266590, China)

  • Zhihao Gao

    (College of Energy and Mining Engineering, Shandong University of Science and Technology, Qingdao 266590, China)

  • Yafei Cheng

    (College of Energy and Mining Engineering, Shandong University of Science and Technology, Qingdao 266590, China)

  • Jinming Han

    (College of Energy and Mining Engineering, Shandong University of Science and Technology, Qingdao 266590, China)

  • Lei Yang

    (College of Energy and Mining Engineering, Shandong University of Science and Technology, Qingdao 266590, China)

Abstract

To address the support difficulties caused by the dynamic pressure from the adjacent working face in gob-side entry driving, this study, taking the 8103 working face of the Jinhuagong Coal Mine in Shanxi Province as an example, adopted methods such as theoretical analysis, physical experiments, numerical simulations, and field practices to explore roof-cutting and pressure-relieving techniques to control the surrounding rocks in gob-side entry driving with small coal pillars under dynamic pressure. Fractures of the lateral roof, stresses on the surrounding rock, and deformations with different cutting-roof parameters were analyzed to determine the reasonable parameters for applications. The following results have been obtained. The longer the lateral cantilever length of the roof, the greater the load borne by the surrounding rock. Therefore, the key to reducing the confining pressure in a roadway is reducing the lateral cantilever length of the roof. After roof cutting, the roof of the gob area collapsed more completely. The stress on both sides of the coal pillar and that on the ribs of the solid coal dropped by 7.72 MPa and 4.16 MPa, respectively. The key roof-cutting parameters were analyzed by the UDEC numerical software, and the reasonable roof-cutting angle and height were determined to be 12° and 14 m. A support scheme combining “steel strip + bolt + anchor cable + roof cutting” was proposed. With the scheme applied, the displacement of both sides of the coal pillar was 61 mm shorter than that in the non-test section, and the duration in which the roadway was affected by mining was 11 days shorter. Therefore, the rationality of the selected roof-cutting and support parameters in this study is verified. The proposed scheme can effectively control the stability of surrounding rocks in gob-side entry driving with small coal pillars under dynamic pressure.

Suggested Citation

  • Shihao Guo & Shanchao Hu & Junhong Huang & Zhihao Gao & Yafei Cheng & Jinming Han & Lei Yang, 2023. "Stability Control Technology for Surrounding Rocks in Gob-Side Entry Driving with Small Coal Pillars under Dynamic Pressure," Energies, MDPI, vol. 16(23), pages 1-24, December.
  • Handle: RePEc:gam:jeners:v:16:y:2023:i:23:p:7887-:d:1293010
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/1996-1073/16/23/7887/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/1996-1073/16/23/7887/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Haojie Xue & Yubing Gao & Xingyu Zhang & Xichun Tian & Haosen Wang & Di Yuan, 2019. "Directional Blasting Fracturing Technology for the Stability Control of Key Strata in Deep Thick Coal Mining," Energies, MDPI, vol. 12(24), pages 1-19, December.
    2. Yujiang Zhang & Yining Wang & Bingyuan Cui & Guorui Feng & Shuai Zhang & Chunwang Zhang & Zhengjun Zhang, 2023. "A Disturbed Voussoir Beam Structure Mechanical Model and Its Application in Feasibility Determination of Upward Mining," Energies, MDPI, vol. 16(20), pages 1-18, October.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Chunwang Zhang & Zhixin Jin & Guorui Feng & Lei Zhang & Rui Gao & Chun Li, 2024. "Promoting Sustainable Coal Gas Development: Microscopic Seepage Mechanism of Natural Fractured Coal Based on 3D-CT Reconstruction," Sustainability, MDPI, vol. 16(11), pages 1-16, May.
    2. Hui Liu & Zhenhua Jiang & Wansheng Chen & Fei Chen & Fenglin Ma & Donghao Li & Zhaoyang Liu & Hongke Gao, 2022. "A Simulation Experimental Study on the Advance Support Mechanism of a Roadway Used with the Longwall Coal Mining Method," Energies, MDPI, vol. 15(4), pages 1-10, February.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:16:y:2023:i:23:p:7887-:d:1293010. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.