Author
Listed:
- Emilio C. Piesciorovsky
(Oak Ridge National Laboratory, Electrification and Energy Infrastructures Division, Oak Ridge, TN 37831, USA)
- Raymond Borges Hink
(Oak Ridge National Laboratory, Electrification and Energy Infrastructures Division, Oak Ridge, TN 37831, USA)
- Aaron Werth
(Oak Ridge National Laboratory, Cyber Resilience and Intelligence Division, Oak Ridge, TN 37831, USA)
- Gary Hahn
(Oak Ridge National Laboratory, Electrification and Energy Infrastructures Division, Oak Ridge, TN 37831, USA)
- Annabelle Lee
(Nevermore Security LLC, 31256 Stone Canyon Rd, Evergreen, CO 80439, USA)
- Yarom Polsky
(Oak Ridge National Laboratory, Manufacturing Science Division, One Bethel Valley Rd, Oak Ridge, TN 37830, USA)
Abstract
Electrical utility substations are wired with intelligent electronic devices (IEDs), such as protective relays, power meters, and communication switches. Substation engineers commission these IEDs to assess the appropriate measurements for monitoring, control, power system protection, and communication applications. Like real electrical utility substations, complex electrical substation grid testbeds (ESGTs) need to be assessed for measuring current and voltage signals in monitoring, power system protection, control (synchro check), and communication applications that are limited by small-measurement percentage errors. In the process of setting an ESGT with real-time simulators and IEDs in the loop, protective relays, power meters, and communication devices must be commissioned before running experiments. In this study, an ESGT with IEDs and distributed ledger technology was developed. The ESGT with a real-time simulator and IEDs in the loop was satisfactorily assessed and commissioned. The commissioning and problem-solving tasks of the testbed are described to define a method with flowcharts to assess possible troubleshooting in ESGTs. This method was based on comparing the simulations versus IED measurements for the phase current and voltage magnitudes, three-phase phasor diagrams, breaker states, protective relay times with selectivity coordination at electrical faults, communication data points, and time-stamp sources.
Suggested Citation
Emilio C. Piesciorovsky & Raymond Borges Hink & Aaron Werth & Gary Hahn & Annabelle Lee & Yarom Polsky, 2023.
"Assessment and Commissioning of Electrical Substation Grid Testbed with a Real-Time Simulator and Protective Relays/Power Meters in the Loop,"
Energies, MDPI, vol. 16(11), pages 1-26, May.
Handle:
RePEc:gam:jeners:v:16:y:2023:i:11:p:4407-:d:1159443
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:16:y:2023:i:11:p:4407-:d:1159443. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.