Author
Listed:
- Aiguo Hu
(State Key Laboratory of Oil and Gas Reservoir Geology and Exploitation, Chengdu University of Technology, Chengdu 610059, China
College of Energy, Chengdu University of Technology, Chengdu 610059, China
Research Institute of Engineering and Technique, Sinopec Huabei Sub-Company, Zhengzhou 450006, China)
- Kezhi Li
(Research Institute of Engineering and Technique, Sinopec Huabei Sub-Company, Zhengzhou 450006, China)
- Yunhui Feng
(State Key Laboratory of Oil and Gas Reservoir Geology and Exploitation, Chengdu University of Technology, Chengdu 610059, China
College of Energy, Chengdu University of Technology, Chengdu 610059, China)
- Hucheng Fu
(Research Institute of Engineering and Technique, Sinopec Huabei Sub-Company, Zhengzhou 450006, China)
- Ying Zhong
(State Key Laboratory of Oil and Gas Reservoir Geology and Exploitation, Chengdu University of Technology, Chengdu 610059, China
College of Energy, Chengdu University of Technology, Chengdu 610059, China)
Abstract
The currently reported bottom water sealing materials and fracturing technologies can hardly simultaneously achieve the high production and low water cut of gas reservoirs due to the complexity of various formation conditions. Therefore, without controlling the fracturing scale and injection volume, a kind of polylactide polymer water plugging material with a density of 1.15–2.0 g/cm 3 is developed, which can be used to seal the bottom water of a gas–water differential layer by contact solidification with water and automatic degradation with natural gas. This technology can not only fully release the production capacity of the gas reservoir but also effectively control water production and realize the efficient fracturing development of the target gas reservoir. Laboratory test results show that the smart plugging agent has a bottom water plugging rate of 100%, and the low-density plugging agent has a dissolution rate of 96.7% in methane gas at 90 °C for 4 h and a dissolution rate of 97.6% in methane gas at 60 °C for 6 h, showing remarkable gas degradation performance. In addition, settlement experiments show that the presence of a proppant can increase the settlement rate of a plugging agent up to many times (up to 21 times) in both water and guanidine gum solution. According to the actual conditions of well J66-8-3, a single-well water plugging fracturing scheme was prepared by optimizing the length of fracture, plugging agent dosage, and plugging agent sinking time, and a post-evaluation method was proposed. It has guiding significance to the development of similar gas reservoirs.
Suggested Citation
Aiguo Hu & Kezhi Li & Yunhui Feng & Hucheng Fu & Ying Zhong, 2022.
"Laboratory Evaluation and Field Application of a Gas-Soluble Plugging Agent: Development of Bottom Water Plugging Fracturing Technology,"
Energies, MDPI, vol. 15(18), pages 1-24, September.
Handle:
RePEc:gam:jeners:v:15:y:2022:i:18:p:6761-:d:916100
Download full text from publisher
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:15:y:2022:i:18:p:6761-:d:916100. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.