Author
Listed:
- Zhijin Shen
(School of Earth Sciences and Engineering, Hohai University, Nanjing 211100, China
Changjiang Survey, Planning, Design and Research Co., Ltd., Wuhan 430010, China)
- Jianhong Jia
(Changjiang Survey, Planning, Design and Research Co., Ltd., Wuhan 430010, China)
- Nan Jiang
(Faculty of Engineering, China University of Geosciences (Wuhan), Wuhan 430074, China)
- Bin Zhu
(Faculty of Engineering, China University of Geosciences (Wuhan), Wuhan 430074, China)
- Wenchang Sun
(Faculty of Engineering, China University of Geosciences (Wuhan), Wuhan 430074, China)
Abstract
The suspension pipe bridge has become the main span type due to its large span, light structure, and other characteristics, playing an important role in the construction of the oil and gas backbone network and energy layout. Tunnel-type anchorage (TTA) is a special underground structure that provides anchorage tension for the suspension bridge. Since its form and bearing mechanism are complex, there is no general design method for tunnel-type anchorage so far, and the theoretical and normative research is not mature. In this paper, a field-scale experiment was carried out to study the north side tunnel of Wujiagang Bridge in Yichang, China. According to the similarity principle, the 1:12 tunnel anchor scale model was established. The tunnel anchor scale model is selected in the area adjacent to the actual project site to ensure the similarity of stratigraphic conditions. Through the use of a displacement meter, inclinometer hole, strain gauge, micrometers, and other comprehensive monitoring methods, the design load test, overload test, overload rheological test, and ultimate bearing capacity failure test were carried out. Through the structural deformation observation and stress observation of the anchorage body and surrounding rock, the stress deformation characteristics and rheological characteristics of the anchorage body and surrounding rock in the field-scale experiment were analyzed. The deformation failure mechanism, deformation failure process, potential failure mode, and overload capacity of solid tunnel anchor were studied. The control indexes such as deformation and stress values of key parts of the solid tunnel anchor at different stages are predicted. Based on the limit equilibrium analysis results of the model, the safety and rationality of the tunnel anchorage structure design of the actual suspension bridge were evaluated.
Suggested Citation
Zhijin Shen & Jianhong Jia & Nan Jiang & Bin Zhu & Wenchang Sun, 2022.
"Field-Scale Experiment on Deformation Characteristics and Bearing Capacity of Tunnel-Type Anchorage of Suspension Bridge,"
Energies, MDPI, vol. 15(13), pages 1-22, June.
Handle:
RePEc:gam:jeners:v:15:y:2022:i:13:p:4772-:d:851547
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:15:y:2022:i:13:p:4772-:d:851547. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.