IDEAS home Printed from https://ideas.repec.org/a/gam/jeners/v14y2021i16p4719-d607880.html
   My bibliography  Save this article

Marine Energy Environmental Permitting and Compliance Costs

Author

Listed:
  • William J. Peplinski

    (Sandia National Laboratories, Albuquerque, NM 87185, USA)

  • Jesse Roberts

    (Sandia National Laboratories, Albuquerque, NM 87185, USA)

  • Geoff Klise

    (Sandia National Laboratories, Albuquerque, NM 87185, USA)

  • Sharon Kramer

    (H. T. Harvey & Associates, Los Gatos, CA 95032, USA)

  • Zach Barr

    (Kearns & West, San Francisco, CA 94104, USA)

  • Anna West

    (Kearns & West, San Francisco, CA 94104, USA)

  • Craig Jones

    (Integral Consulting, Santa Cruz, CA 95060, USA)

Abstract

Costs to permit Marine Energy projects are poorly understood. In this paper we examine environmental compliance and permitting costs for 19 projects in the U.S., covering the last 2 decades. Guided discussions were conducted with developers over a 3-year period to obtain historical and ongoing project cost data relative to environmental studies (e.g., baseline or pre-project site characterization as well as post-installation effects monitoring), stakeholder outreach, and mitigation, as well as qualitative experience of the permitting process. Data are organized in categories of technology type, permitted capacity, pre- and post-installation, geographic location, and funding types. We also compare our findings with earlier logic models created for the Department of Energy (i.e., Reference Models). Environmental studies most commonly performed were for Fish and Fisheries, Noise, Marine Habitat/Benthic Studies and Marine Mammals. Studies for tidal projects were more expensive than those performed for wave projects and the range of reported project costs tended to be wider than ranges predicted by logic models. For eight projects reporting full project costs, from project start to FERC or USACE permit, the average amount for environmental permitting compliance was 14.6%.

Suggested Citation

  • William J. Peplinski & Jesse Roberts & Geoff Klise & Sharon Kramer & Zach Barr & Anna West & Craig Jones, 2021. "Marine Energy Environmental Permitting and Compliance Costs," Energies, MDPI, vol. 14(16), pages 1-18, August.
  • Handle: RePEc:gam:jeners:v:14:y:2021:i:16:p:4719-:d:607880
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/1996-1073/14/16/4719/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/1996-1073/14/16/4719/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Haley A Viehman & Gayle Barbin Zydlewski, 2017. "Multi-scale temporal patterns in fish presence in a high-velocity tidal channel," PLOS ONE, Public Library of Science, vol. 12(5), pages 1-20, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Zachary Barr & Jesse Roberts & William Peplinski & Anna West & Sharon Kramer & Craig Jones, 2021. "The Permitting, Licensing and Environmental Compliance Process: Lessons and Experiences within U.S. Marine Renewable Energy," Energies, MDPI, vol. 14(16), pages 1-16, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Garrett Staines & Gayle Zydlewski & Haley Viehman, 2019. "Changes in Relative Fish Density Around a Deployed Tidal Turbine during on-Water Activities," Sustainability, MDPI, vol. 11(22), pages 1-12, November.
    2. Williamson, Benjamin & Fraser, Shaun & Williamson, Laura & Nikora, Vladimir & Scott, Beth, 2019. "Predictable changes in fish school characteristics due to a tidal turbine support structure," Renewable Energy, Elsevier, vol. 141(C), pages 1092-1102.
    3. Scherelis, Constantin & Penesis, Irene & Hemer, Mark A. & Cossu, Remo & Wright, Jeffrey T. & Guihen, Damien, 2020. "Investigating biophysical linkages at tidal energy candidate sites: a case study for combining environmental assessment and resource characterisation," Renewable Energy, Elsevier, vol. 159(C), pages 399-413.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:14:y:2021:i:16:p:4719-:d:607880. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.