IDEAS home Printed from https://ideas.repec.org/a/gam/jeners/v13y2020i20p5292-d426548.html
   My bibliography  Save this article

Incomplete Cross-Bonding in the MV Line. Experience from the Operation of MV Single Cable Lines

Author

Listed:
  • Krzysztof Dobrzynski

    (Faculty of Electrical and Control Engineering, Gdańsk University of Technology, Narutowicza 11/12, PL-80-233 Gdańsk, Poland)

  • Zbigniew Lubosny

    (Faculty of Electrical and Control Engineering, Gdańsk University of Technology, Narutowicza 11/12, PL-80-233 Gdańsk, Poland)

  • Jacek Klucznik

    (Faculty of Electrical and Control Engineering, Gdańsk University of Technology, Narutowicza 11/12, PL-80-233 Gdańsk, Poland)

  • Janusz Grala

    (ENERGA-OPERATOR SA, Marynarki Polskiej 130, PL-80-557 Gdańsk, Poland)

  • Dominik Falkowski

    (ENERGA-OPERATOR SA, Marynarki Polskiej 130, PL-80-557 Gdańsk, Poland)

Abstract

Cable lines are one of the basic components of power systems. Medium and high voltage cables mainly comprise a metallic sheath, which is concentric to the main core conductor. There are several operating schemes of such cable lines, which differ in the place of earthing of sheaths and the possible use of the sheaths and/or conductors crossing. The sheaths cross-bonding is typically done in two places of one cable line section, and it allows to reduce power losses. Nevertheless, the use of incomplete sheaths crossing—only in one place on cable route may have economic justification. The paper presents an incomplete sheaths cross-bonding analysis of an existing medium voltage cable line. The results obtained by the mathematical model are validated by measurements taken on 30 October 2019 on an existing cable line. Measurements recorded on a real object for various systems of crossing sheaths are presented. The influence of incorrect sheaths crossing on the measured quantities was shown. In addition, the risk of excess voltage on the sheaths during short-circuits has been verified using a mathematical model.

Suggested Citation

  • Krzysztof Dobrzynski & Zbigniew Lubosny & Jacek Klucznik & Janusz Grala & Dominik Falkowski, 2020. "Incomplete Cross-Bonding in the MV Line. Experience from the Operation of MV Single Cable Lines," Energies, MDPI, vol. 13(20), pages 1-19, October.
  • Handle: RePEc:gam:jeners:v:13:y:2020:i:20:p:5292-:d:426548
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/1996-1073/13/20/5292/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/1996-1073/13/20/5292/
    Download Restriction: no
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:13:y:2020:i:20:p:5292-:d:426548. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.