Defining Transmission System Operators’ Investment Shares for Phase-Shifting Transformers Used for Coordinated Redispatch

Author

Listed:
  • Michał Kłos

    (Interdisciplinary Division for Energy Analyses, National Centre for Nuclear Research, 02-724 Warsaw, Poland)

  • Endika Urresti-Padrón

    (Interdisciplinary Division for Energy Analyses, National Centre for Nuclear Research, 02-724 Warsaw, Poland)

  • Przemysław Krzyk

    (Interdisciplinary Division for Energy Analyses, National Centre for Nuclear Research, 02-724 Warsaw, Poland)

  • Wojciech Jaworski

    (Interdisciplinary Division for Energy Analyses, National Centre for Nuclear Research, 02-724 Warsaw, Poland)

  • Marcin Jakubek

    (Interdisciplinary Division for Energy Analyses, National Centre for Nuclear Research, 02-724 Warsaw, Poland)

Abstract

The implementation of network codes within the framework of European Transmission System Operators (TSOs), involves redesigning the process of executing remedial actions aimed at maintaining the power system on a daily basis. One of the key elements of this redesign is the co-optimisation of all accessible measures, bringing a cost-optimal result and providing network security for the entire Capacity Calculation Region (CCR). This specifically means that the currently installed Phase Shifting Transformers (PSTs) are expected to be utilised for the benefit of the whole CCR, with no special priority to any issues incurred by the owner. Therefore, this paper addresses any questions regarding the rules of financing (investment shares per TSO) to be applied for future PST installations. The investment shares are calculated based on the exemplary implementation of a new European procedure – cost-sharing of remedial actions. Consequently, another long-term application of this process is postulated. In order to support the claims with numerical evidence, two scenarios with new PST investments are analysed. The conclusions drawn show that the largest investment burden can be imposed upon zones different from the area of which the new PST installation has taken place. As a result, joint TSOs’ investments may be a potential solution to financing new devices used for future coordination of remedial actions.

Suggested Citation

  • Michał Kłos & Endika Urresti-Padrón & Przemysław Krzyk & Wojciech Jaworski & Marcin Jakubek, 2020. "Defining Transmission System Operators’ Investment Shares for Phase-Shifting Transformers Used for Coordinated Redispatch," Energies, MDPI, vol. 13(15), pages 1-17, August.
  • Handle: RePEc:gam:jeners:v:13:y:2020:i:15:p:4019-:d:394229
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/1996-1073/13/15/4019/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/1996-1073/13/15/4019/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Endika Urresti-Padrón & Marcin Jakubek & Wojciech Jaworski & Michał Kłos, 2020. "Pre-Selection of the Optimal Sitting of Phase-Shifting Transformers Based on an Optimization Problem Solved within a Coordinated Cross-Border Congestion Management Process," Energies, MDPI, vol. 13(14), pages 1-17, July.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Titz, Maurizio & Pütz, Sebastian & Witthaut, Dirk, 2024. "Identifying drivers and mitigators for congestion and redispatch in the German electric power system with explainable AI," Applied Energy, Elsevier, vol. 356(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Jan Marc Schwidtal & Marco Agostini & Fabio Bignucolo & Massimiliano Coppo & Patrizia Garengo & Arturo Lorenzoni, 2021. "Integration of Flexibility from Distributed Energy Resources: Mapping the Innovative Italian Pilot Project UVAM," Energies, MDPI, vol. 14(7), pages 1-29, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:13:y:2020:i:15:p:4019-:d:394229. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.