Building “with the Systems” vs. Building “in the System” of IMS Open Technology of Prefabricated Construction: Challenges for New “Infill” Industry for Massive Housing Retrofitting

Author

Listed:
  • Jelena Nikolic

    (School of Architecture (ETSAB), Universitat Politècnica de Catalunya (UPC), Av. Diagonal 649, 08028 Barcelona, Spain)

Abstract

Post-war industrialized housing between 1955 and 1985 in Belgrade and its special form of integrated prefabrication has been analyzed with a strong interest in transformation capacity of industrialized building model (IBM) on different technical levels. Research field is massive housing up to 23 floors, 400 dwellings per building and different housing layouts—to be evaluated for potential retrofitting at the dwelling level. IBM for massive housing built with IMS construction technology represents an integration of systems’ components into hierarchy assemblies by simple joints. IMS Building Technology by IMS Institute is the system for high-rise structures with prefabricated elements of the skeleton. In order to assess the current situation regarding the selection and implementation of energy savings measures and the role of industrialized technology in supporting the rehabilitation of post-war housing in Belgrade—building configuration model and IMS construction technology has been analyzed, providing in-depth information on the way building components and systems are put together into IBM. In which way retrofit may be approached? IBM is represented with graph model (GM) diagram to describe a number of value-added processes according to independent systems/components and flexible connections. This paper highlights the technological aspects of “open” prefabrication industry and building with the systems that should be assessed in the future retrofitting of massive housing based on industrialization and energy efficiency. The paper proposes an IBM that provides concrete description of massive housing buildings, the requirements for information to be provided to approving refurbishment processes. The research also addresses both: challenges as well as opportunities for advancing Building Information Modeling (BIM) standards in off-site re-construction of massive housing with new “infill” industry.

Suggested Citation

  • Jelena Nikolic, 2018. "Building “with the Systems” vs. Building “in the System” of IMS Open Technology of Prefabricated Construction: Challenges for New “Infill” Industry for Massive Housing Retrofitting," Energies, MDPI, vol. 11(5), pages 1-17, May.
  • Handle: RePEc:gam:jeners:v:11:y:2018:i:5:p:1128-:d:144295
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/1996-1073/11/5/1128/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/1996-1073/11/5/1128/
    Download Restriction: no
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Xinying Cao & Xiaodong Li & Yangzhi Yan & Xiang Yuan, 2018. "Skeleton and Infill Housing Construction Delivery Process Optimization Based on the Design Structure Matrix," Sustainability, MDPI, vol. 10(12), pages 1-18, December.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:11:y:2018:i:5:p:1128-:d:144295. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.