Author
Listed:
- Jorge Quijano
(Institute of Engineering and Technology, Department of Industrial and Manufacturing Engineering, Universidad Autónoma de Ciudad Juárez, Ciudad Juárez 32310, Mexico)
- Nohemi Torres Cruz
(Institute of Engineering and Technology, Department of Industrial and Manufacturing Engineering, Universidad Autónoma de Ciudad Juárez, Ciudad Juárez 32310, Mexico)
- Leslie Quijano-Quian
(College of Science, University of Texas El Paso, El Paso, TX 79968, USA)
- Eduardo Rafael Poblano-Ojinaga
(Tecnológico Nacional de México, Instituto Tecnológico de Ciudad Juárez, Ciudad Juárez 32500, Mexico)
- Salvador Anacleto Noriega Morales
(Institute of Engineering and Technology, Department of Industrial and Manufacturing Engineering, Universidad Autónoma de Ciudad Juárez, Ciudad Juárez 32310, Mexico)
Abstract
Optimizing production efficiency in Surface-Mount Technology (SMT) manufacturing is a critical challenge, particularly in high-mix environments where frequent product changeovers can lead to significant downtime. This study presents a scheduling algorithm that minimizes changeover times on SMT lines by leveraging the commonality of Surface-Mount Device (SMD) reel part numbers across product Bills of Materials (BOMs). The algorithm’s capabilities were demonstrated through both simulated datasets and practical validation trials, providing a comprehensive evaluation framework. In the practical implementation, the algorithm successfully aligned predicted and measured changeover times, highlighting its applicability and accuracy in operational settings. The proposed approach integrates heuristic and optimization techniques to identify scheduling strategies that not only minimize reel changes but also support production scalability and operational flexibility. This framework offers a robust solution for optimizing SMT workflows, enhancing productivity, and reducing resource inefficiencies in both greenfield projects and established manufacturing environments.
Suggested Citation
Jorge Quijano & Nohemi Torres Cruz & Leslie Quijano-Quian & Eduardo Rafael Poblano-Ojinaga & Salvador Anacleto Noriega Morales, 2025.
"Data-Driven Scheduling Optimization for SMT Lines Using SMD Reel Commonality,"
Data, MDPI, vol. 10(2), pages 1-24, January.
Handle:
RePEc:gam:jdataj:v:10:y:2025:i:2:p:16-:d:1579631
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jdataj:v:10:y:2025:i:2:p:16-:d:1579631. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.