IDEAS home Printed from https://ideas.repec.org/a/eme/qrampp/qram-10-2015-0095.html
   My bibliography  Save this article

Time-driven activity-based costing

Author

Listed:
  • Rúben Silva Barros
  • Ana Maria Dias Simões da Costa Ferreira

Abstract

Purpose - By designing a pilot time-driven activity-based costing (TDABC) model, this study aims to examine in depth the suitability and the complexity of TDABC in a manufacturing company. Design/methodology/approach - To obtain a deeper understanding on the matters to analyse, this research adopts an interventionist approach. The host organisation is GP, a Portuguese company in the frozen food sector. Findings - The authors’ experience allows them to assert that TDABC is suitable for a manufacturing company and it is able to deal with the variability of the industrial processes. Nonetheless, through a comparison with the models presented in the literature, TDABC appears to be more complex for manufacturing. The authors argue that this happens for two reasons. First, the two types of resources (human labour and machinery) used in production areas create a need to split tasks and to create two equations for each process, something that does not happen in service companies. Second, times are difficult to individualise for certain highly automated procedures, which could also give rise to some errors. Research limitations/implications - The designed model is compared to other models presented in the literature. Practical implications - This study shows a real example of TDABC in manufacturing and the procedural innovation of the time equations. Originality/value - As the TDABC literature has been mostly focused on examples of service companies, the authors examine the technical suitability and the complexity of TDABC in manufacturing companies.

Suggested Citation

  • Rúben Silva Barros & Ana Maria Dias Simões da Costa Ferreira, 2017. "Time-driven activity-based costing," Qualitative Research in Accounting & Management, Emerald Group Publishing Limited, vol. 14(1), pages 2-20, April.
  • Handle: RePEc:eme:qrampp:qram-10-2015-0095
    DOI: 10.1108/QRAM-10-2015-0095
    as

    Download full text from publisher

    File URL: https://www.emerald.com/insight/content/doi/10.1108/QRAM-10-2015-0095/full/html?utm_source=repec&utm_medium=feed&utm_campaign=repec
    Download Restriction: Access to full text is restricted to subscribers

    File URL: https://www.emerald.com/insight/content/doi/10.1108/QRAM-10-2015-0095/full/pdf?utm_source=repec&utm_medium=feed&utm_campaign=repec
    Download Restriction: Access to full text is restricted to subscribers

    File URL: https://libkey.io/10.1108/QRAM-10-2015-0095?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Attilio Mucelli & Francesca Spigarelli & Dominique Lepore, 2018. "National Culture for a Participatory Time-driven Activity Based Costing: A Conceptual Framework and Research Agenda," International Journal of Business Administration, International Journal of Business Administration, Sciedu Press, vol. 9(2), pages 56-66, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eme:qrampp:qram-10-2015-0095. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Emerald Support (email available below). General contact details of provider: .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.