Author
Listed:
- Mostafa Moghimi
- Mohammad Ali Beheshtinia
Abstract
Purpose - The purpose of this study is to investigate the optimization of the scheduling of production and transportation systems while considering delay time (DT) and environmental pollution (EP) concurrently. To this, an integrated multi-site manufacturing process using a cumulative transportation system is investigated. Additionally, a novel multi-society genetic algorithm is developed to reach the best answers. Design/methodology/approach - A bi-objective model is proposed to optimize the production and transportation process with the objectives of minimizing DT and EP. This is solved by a social dynamic genetic algorithm (SDGA), which is a novel multi-society genetic algorithm, in scenarios of equal and unequal impacts of each objective. The impacts of each objective are calculated by the analytical hierarchical process (AHP) using experts’ opinions. Results are compared by dynamic genetic algorithm and optimum solution results. Findings - Results clearly depict the efficiency of the proposed algorithm and model in the scheduling of production and transportation systems with the objectives of minimizing DT and EP concurrently. Although SDGA’s performance is acceptable in all cases, in comparison to other genetic algorithms, it needs more process time which is the cost of reaching better answers. Additionally, SDGA had better performance in variable weights of objectives in comparison to itself and other genetic algorithms. Research limitations/implications - This research is an improvement which allows both society and industry to elevate the levels of their satisfaction while their social responsibilities have been glorified through assuaging the concerns of customers on distribution networks’ emission, competing more efficient and effective in the global market and having the ability to make deliberate decisions far from bias. Additionally, implications of the developed genetic algorithm help directly to the organizations engaged with intelligent production and/or transportation planning which society will be merited indirectly from their outcomes. It also could be utilitarian for organizations that are engaged with small, medium and big data analysis in their processes and want to use more effective and more efficient tools. Originality/value - Optimization of EP and DT are considered simultaneously in both model and algorithm in this study. Besides, a novel genetic algorithm, SDGA, is proposed. In this multi-society algorithm, each society is focused on a particular objective; however, in one society all the feasible answers will have been integrated and optimization will have been continued.
Suggested Citation
Mostafa Moghimi & Mohammad Ali Beheshtinia, 2021.
"Optimization of delay time and environmental pollution in scheduling of production and transportation system: a novel multi-society genetic algorithm approach,"
Management Research Review, Emerald Group Publishing Limited, vol. 44(10), pages 1427-1453, May.
Handle:
RePEc:eme:mrrpps:mrr-04-2020-0203
DOI: 10.1108/MRR-04-2020-0203
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eme:mrrpps:mrr-04-2020-0203. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Emerald Support (email available below). General contact details of provider: .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.