Author
Listed:
- Peter E.D. Love
- David J. Edwards
- Jim Smith
Abstract
Purpose - This paper aims to take a forensic approach to identify the causal mechanisms of rework in a structural steel supply chain. Rework is an area that has received limited attention, yet it is a major contributor to time and cost overruns in projects.Design/methodology/approach– The research uses an interpretative case study approach to gain an understanding about how and why rework occurred. To determine the causal variables of rework the traditional scientific concept of causality founded on themono‐causal modelin the physical and biological sciences was subject to subtle changes, and adapted to a social context as construction projects are essentially complex social systems. In this instance causality was not considered to be linear, proportional or incremental, but multi‐dimensional whereby each factor is interrelated and multi‐causal in nature.Findings– The findings reveal that the cause of rework in this case was poor information flow and the absence of a quality focus. This was exacerbated by the sequential procurement process and fixed power structure of the contract, and as a consequence poor decision‐making, communication, integration and co‐ordination were experienced.Practical implications– The research has highlighted the need to re‐design the structure of supply chains in construction projects, especially if information and communication technologies are to be effectively used. A conceptual model was developed from the case study findings to illustrate the interconnectedness of factors affecting rework. This model can be used by organisations for reducing the incidence of rework.Originality/value– The research has identified key variables that can contribute to the incidence of rework in projects. A pragmatic model for reducing the incidence of rework is proposed. The model that is propagated will be of use to practitioners and researchers working within project environments.
Suggested Citation
Peter E.D. Love & David J. Edwards & Jim Smith, 2005.
"A forensic examination of the causal mechanisms of rework in a structural steel supply chain,"
Managerial Auditing Journal, Emerald Group Publishing Limited, vol. 20(2), pages 187-197, February.
Handle:
RePEc:eme:majpps:02686900510574593
DOI: 10.1108/02686900510574593
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eme:majpps:02686900510574593. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Emerald Support (email available below). General contact details of provider: .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.