- Bruno C. Matos
- Carlos O. Cruz
- Fernando A. Branco
Abstract
Purpose - This study aims to address gaps in the integration of Building Information Modelling (BIM) into procurement processes for construction works under the Portuguese Code of Public Contracts (CCP). The goal is to improve procurement procedures with practical recommendations benefiting both public and private sectors, and applicable in other countries, promoting efficient BIM use in construction projects. Design/methodology/approach - The study involved a literature review and expert interviews to identify opportunities within the CCP related to construction procurement that impact BIM implementation during construction works. It critically analyzed these insights and proposed specific adjustments to the CCP to enhance BIM application in public construction works. Findings - The study provides practical recommendations to address two main gaps identified in the literature: the neglect of non-specific digitalization factors influencing BIM implementation, and the lack of consideration for specific constraints in public procurement, particularly those dictated by legal frameworks like the CCP. These recommendations aim to optimize traditional procurement provisions for public construction, thereby improving BIM utilization on-site. Social implications - The study’s social implications include enhanced transparency and efficiency in construction processes, leading to reduced delays and costs for both stakeholders and the public. By optimizing BIM practices, public resources can be used more effectively in construction projects. The research may also accelerate the adoption of advanced technologies in the industry and improve urban development through better-planned and executed infrastructure projects. Additionally, the study’s recommendations could serve as a model for other countries, fostering the adoption of higher construction standards on a global scale. Originality/value - The study’s original contribution lies in its comprehensive examination of public procurement procedures, particularly within the CCP context, to enhance the utilization of BIM during construction works. It uniquely identifies literature gaps and provides practical recommendations addressing non-specific digitalization factors and legal constraints in public procurement.
Suggested Citation
Bruno C. Matos & Carlos O. Cruz & Fernando A. Branco, 2024.
"Building information modeling in construction projects: the case of the Portuguese code of public contracts,"
Journal of Public Procurement, Emerald Group Publishing Limited, vol. 25(1), pages 1-40, December.
Handle:
RePEc:eme:jopppp:jopp-02-2024-0022
DOI: 10.1108/JOPP-02-2024-0022
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eme:jopppp:jopp-02-2024-0022. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Emerald Support (email available below). General contact details of provider: .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.