Assessment and statistics of Brazilian hydroelectric power plants: Dam areas versus installed and firm power
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Liu, Benxi & Cheng, Chuntian & Wang, Sen & Liao, Shengli & Chau, Kwok-Wing & Wu, Xinyu & Li, Weidong, 2018. "Parallel chance-constrained dynamic programming for cascade hydropower system operation," Energy, Elsevier, vol. 165(PA), pages 752-767.
- Olaya, Yris & Arango-Aramburo, Santiago & Larsen, Erik R., 2016. "How capacity mechanisms drive technology choice in power generation: The case of Colombia," Renewable and Sustainable Energy Reviews, Elsevier, vol. 56(C), pages 563-571.
- Arabatzis, Garyfallos & Myronidis, Dimitris, 2011. "Contribution of SHP Stations to the development of an area and their social acceptance," Renewable and Sustainable Energy Reviews, Elsevier, vol. 15(8), pages 3909-3917.
- Moreira, João M.L. & Cesaretti, Marcos A. & Carajilescov, Pedro & Maiorino, José R., 2015. "Sustainability deterioration of electricity generation in Brazil," Energy Policy, Elsevier, vol. 87(C), pages 334-346.
- Eric Mensah Mortey & Kouakou Lazare Kouassi & Arona Diedhiou & Sandrine Anquetin & Mathieu Genoud & Benoit Hingray & Didier Guy Marcel Kouame, 2019. "Sustainable Hydroelectric Dam Management in the Context of Climate Change: Case of the Taabo Dam in Côte D’Ivoire, West Africa," Sustainability, MDPI, vol. 11(18), pages 1-32, September.
- Catolico, A.C.C. & Maestrini, M. & Strauch, J.C.M. & Giusti, F. & Hunt, J., 2021. "Socioeconomic impacts of large hydroelectric power plants in Brazil: A synthetic control assessment of Estreito hydropower plant," Renewable and Sustainable Energy Reviews, Elsevier, vol. 151(C).
- Fang, Delin & Chen, Shaoqing & Chen, Bin, 2015. "Emergy analysis for the upper Mekong river intercepted by the Manwan hydropower construction," Renewable and Sustainable Energy Reviews, Elsevier, vol. 51(C), pages 899-909.
More about this item
Keywords
Hydroelectric power plants Dam area Environmental index Brazil;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:rensus:v:12:y:2008:i:7:p:1843-1863. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/600126/description#description .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.