A hybrid AHP-PROMETHEE II onshore wind farms multicriteria suitability analysis using kNN and SVM regression models in northeastern Greece
Author
Abstract
Suggested Citation
DOI: 10.1016/j.renene.2023.119795
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Bertrand Mareschal & Jean Pierre Brans, 1994. "PROMCALC & GAIA: a new decision support system for multicriteria decision aid," ULB Institutional Repository 2013/9349, ULB -- Universite Libre de Bruxelles.
- Despotovic, Milan & Nedic, Vladimir & Despotovic, Danijela & Cvetanovic, Slobodan, 2016. "Evaluation of empirical models for predicting monthly mean horizontal diffuse solar radiation," Renewable and Sustainable Energy Reviews, Elsevier, vol. 56(C), pages 246-260.
- Thomas L. Saaty, 1986. "Axiomatic Foundation of the Analytic Hierarchy Process," Management Science, INFORMS, vol. 32(7), pages 841-855, July.
- Ishizaka, Alessio & Nemery, Philippe & Lidouh, Karim, 2013. "Location selection for the construction of a casino in the Greater London region: A triple multi-criteria approach," Tourism Management, Elsevier, vol. 34(C), pages 211-220.
- Athanasios P. Vavatsikos & Kalliopi F. Sotiropoulou & Veniamin Tzingizis, 2022. "GIS-assisted suitability analysis combining PROMETHEE II, analytic hierarchy process and inverse distance weighting," Operational Research, Springer, vol. 22(5), pages 5983-6006, November.
- Sotiropoulou, Kalliopi F. & Vavatsikos, Athanasios P., 2021. "Onshore wind farms GIS-Assisted suitability analysis using PROMETHEE II," Energy Policy, Elsevier, vol. 158(C).
- Shao, Meng & Han, Zhixin & Sun, Jinwei & Xiao, Chengsi & Zhang, Shulei & Zhao, Yuanxu, 2020. "A review of multi-criteria decision making applications for renewable energy site selection," Renewable Energy, Elsevier, vol. 157(C), pages 377-403.
- Dell’Ovo, Marta & Capolongo, Stefano & Oppio, Alessandra, 2018. "Combining spatial analysis with MCDA for the siting of healthcare facilities," Land Use Policy, Elsevier, vol. 76(C), pages 634-644.
- Karatzoglou, Alexandros & Meyer, David & Hornik, Kurt, 2006. "Support Vector Machines in R," Journal of Statistical Software, Foundation for Open Access Statistics, vol. 15(i09).
- Thomas L. Saaty, 2005. "The Analytic Hierarchy and Analytic Network Processes for the Measurement of Intangible Criteria and for Decision-Making," International Series in Operations Research & Management Science, in: Multiple Criteria Decision Analysis: State of the Art Surveys, chapter 0, pages 345-405, Springer.
- Yildiz, B. & Bilbao, J.I. & Sproul, A.B., 2017. "A review and analysis of regression and machine learning models on commercial building electricity load forecasting," Renewable and Sustainable Energy Reviews, Elsevier, vol. 73(C), pages 1104-1122.
- Zhang, Yongli & Yang, Yuhong, 2015. "Cross-validation for selecting a model selection procedure," Journal of Econometrics, Elsevier, vol. 187(1), pages 95-112.
- Saraswat, S.K. & Digalwar, Abhijeet K. & Yadav, S.S. & Kumar, Gaurav, 2021. "MCDM and GIS based modelling technique for assessment of solar and wind farm locations in India," Renewable Energy, Elsevier, vol. 169(C), pages 865-884.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Hosseini Dehshiri, Seyyed Shahabaddin & Firoozabadi, Bahar, 2024. "Comprehensive framework on wind energy: A sustainable site selection under uncertainty and reliability, layout optimization and 7E analysis," Applied Energy, Elsevier, vol. 373(C).
- Mittal, Prateek & Christopoulos, Giorgos & Subramanian, Sriram, 2024. "Energy enhancement through noise minimization using acoustic metamaterials in a wind farm," Renewable Energy, Elsevier, vol. 224(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Geovanna Villacreses & Diego Jijón & Juan Francisco Nicolalde & Javier Martínez-Gómez & Franz Betancourt, 2022. "Multicriteria Decision Analysis of Suitable Location for Wind and Photovoltaic Power Plants on the Galápagos Islands," Energies, MDPI, vol. 16(1), pages 1-23, December.
- Elkadeem, Mohamed R. & Younes, Ali & Mazzeo, Domenico & Jurasz, Jakub & Elia Campana, Pietro & Sharshir, Swellam W. & Alaam, Mohamed A., 2022. "Geospatial-assisted multi-criterion analysis of solar and wind power geographical-technical-economic potential assessment," Applied Energy, Elsevier, vol. 322(C).
- Asadi, Meysam & Ramezanzade, Mohsen & Pourhossein, Kazem, 2023. "A global evaluation model applied to wind power plant site selection," Applied Energy, Elsevier, vol. 336(C).
- Athanasios P. Vavatsikos & Kalliopi F. Sotiropoulou & Veniamin Tzingizis, 2022. "GIS-assisted suitability analysis combining PROMETHEE II, analytic hierarchy process and inverse distance weighting," Operational Research, Springer, vol. 22(5), pages 5983-6006, November.
- Mohammed Ifkirne & Houssam El Bouhi & Siham Acharki & Quoc Bao Pham & Abdelouahed Farah & Nguyen Thi Thuy Linh, 2022. "Multi-Criteria GIS-Based Analysis for Mapping Suitable Sites for Onshore Wind Farms in Southeast France," Land, MDPI, vol. 11(10), pages 1-26, October.
- Li, Xinyi & Yao, Runming, 2020. "A machine-learning-based approach to predict residential annual space heating and cooling loads considering occupant behaviour," Energy, Elsevier, vol. 212(C).
- Dimitra G. Vagiona, 2021. "Comparative Multicriteria Analysis Methods for Ranking Sites for Solar Farm Deployment: A Case Study in Greece," Energies, MDPI, vol. 14(24), pages 1-23, December.
- Brucker, Klaas De & Verbeke, Alain & Macharis, Cathy, 2004. "The Applicability Of Multicriteria-Analysis To The Evaluation Of Intelligent Transport Systems (Its)," Research in Transportation Economics, Elsevier, vol. 8(1), pages 151-179, January.
- Wątróbski, Jarosław & Bączkiewicz, Aleksandra & Sałabun, Wojciech, 2022. "New multi-criteria method for evaluation of sustainable RES management," Applied Energy, Elsevier, vol. 324(C).
- Nagababu, Garlapati & Puppala, Harish & Pritam, Kocherlakota & Kantipudi, MVV Prasad, 2022. "Two-stage GIS-MCDM based algorithm to identify plausible regions at micro level to install wind farms: A case study of India," Energy, Elsevier, vol. 248(C).
- De Brucker, Klaas & Macharis, Cathy & Verbeke, Alain, 2013. "Multi-criteria analysis and the resolution of sustainable development dilemmas: A stakeholder management approach," European Journal of Operational Research, Elsevier, vol. 224(1), pages 122-131.
- Alphan, Hakan, 2024. "Incorporating visibility information into multi-criteria decision making (MCDM) for wind turbine deployment," Applied Energy, Elsevier, vol. 353(PB).
- Jaros{l}aw Wk{a}tr'obski & Aleksandra Bk{a}czkiewicz & Iga Rudawska, 2023. "A Strong Sustainability Paradigm Based Analytical Hierarchy Process (SSP-AHP) Method to Evaluate Sustainable Healthcare Systems," Papers 2306.00718, arXiv.org.
- Bilgili, Faik & Zarali, Fulya & Ilgün, Miraç Fatih & Dumrul, Cüneyt & Dumrul, Yasemin, 2022. "The evaluation of renewable energy alternatives for sustainable development in Turkey using intuitionistic fuzzy-TOPSIS method," Renewable Energy, Elsevier, vol. 189(C), pages 1443-1458.
- Zehba Raizah & Udaya Kumara Kodipalya Nanjappa & Harshitha Urs Ajjipura Shankar & Umair Khan & Sayed M. Eldin & Rajesh Kumar & Ahmed M. Galal, 2022. "Windmill Global Sourcing in an Initiative Using a Spherical Fuzzy Multiple-Criteria Decision Prototype," Energies, MDPI, vol. 15(21), pages 1-13, October.
- Banai, Reza, 2010. "Evaluation of land use-transportation systems with the Analytic Network Process," The Journal of Transport and Land Use, Center for Transportation Studies, University of Minnesota, vol. 3(1), pages 85-112.
- Guh, Yuh-Yuan, 1997. "Introduction to a new weighting method -- Hierarchy consistency analysis," European Journal of Operational Research, Elsevier, vol. 102(1), pages 215-226, October.
- Xiaoxia Li, 2022. "Research on the Development Level of Rural E-Commerce in China Based on Analytic Hierarchy and Systematic Clustering Method," Sustainability, MDPI, vol. 14(14), pages 1-18, July.
- Guelpa, Elisa & Bischi, Aldo & Verda, Vittorio & Chertkov, Michael & Lund, Henrik, 2019. "Towards future infrastructures for sustainable multi-energy systems: A review," Energy, Elsevier, vol. 184(C), pages 2-21.
- Kieu Anh Nguyen & Walter Chen & Bor-Shiun Lin & Uma Seeboonruang, 2020. "Using Machine Learning-Based Algorithms to Analyze Erosion Rates of a Watershed in Northern Taiwan," Sustainability, MDPI, vol. 12(5), pages 1-16, March.
More about this item
Keywords
Wind farm suitability analysis; Geographic information systems (GIS); PROMETHEE II outranking method; Machine learning; k Nearest Neighbor; Support vector regression;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:renene:v:221:y:2024:i:c:s096014812301710x. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.journals.elsevier.com/renewable-energy .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.