IDEAS home Printed from https://ideas.repec.org/a/eee/recore/v53y2009i3p145-148.html
   My bibliography  Save this article

Benefit analysis on replacing in situ concreting with precast slabs for temporary construction works in pursuing sustainable construction practice

Author

Listed:
  • Shen, Li-yin
  • Tam, Vivian Wing-yan
  • Li, Chao-yang

Abstract

It is well recognised that a significant amount of solid waste is produced from construction work. The increasing generation of construction waste such as used timber formwork, obsolete concrete and packaging, has caused significant pollution to the environment and risen public concern particularly in densely populated cities, such as Hong Kong. The minimization of construction waste has therefore become a pressing issue in pursuing the practice of sustainable construction. This paper shows the betterment of replacing in situ concreting with precast slabs for temporary works to improve sustainable construction performance. Construction waste from the obsolete concrete constitutes a large part of the construction solid waste in a typical building project. The reduction on the obsolescence by using precast slabs can significantly contribute to improving sustainable construction performance. This study identifies cost saving and the betterment of environmental performance by using precast concrete slabs over the in situ concreting. The data used for analysis in the paper were collected from statistics reports and a case study in Hong Kong construction practice. From the case study results, about 43.93%, 64.01% and 70.70% of the cost of using cast in situ concreting can be saved by reusing precast slabs once for temporary works, twice and three times respectively. The findings provide evidence for promoting the use of precast slabs for temporary works, and contribute to the improvement of sustainable construction performance.

Suggested Citation

  • Shen, Li-yin & Tam, Vivian Wing-yan & Li, Chao-yang, 2009. "Benefit analysis on replacing in situ concreting with precast slabs for temporary construction works in pursuing sustainable construction practice," Resources, Conservation & Recycling, Elsevier, vol. 53(3), pages 145-148.
  • Handle: RePEc:eee:recore:v:53:y:2009:i:3:p:145-148
    DOI: 10.1016/j.resconrec.2008.11.001
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0921344908001997
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.resconrec.2008.11.001?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Bruce Mcdonald & Mark Smithers, 1998. "Implementing a waste management plan during the construction phase of a project: a case study," Construction Management and Economics, Taylor & Francis Journals, vol. 16(1), pages 71-78.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Wang, Jiayuan & Li, Zhengdao & Tam, Vivian W.Y., 2014. "Critical factors in effective construction waste minimization at the design stage: A Shenzhen case study, China," Resources, Conservation & Recycling, Elsevier, vol. 82(C), pages 1-7.
    2. Villoria Saez, Paola & del Río Merino, Mercedes & San-Antonio González, Alicia & Porras-Amores, César, 2013. "Best practice measures assessment for construction and demolition waste management in building constructions," Resources, Conservation & Recycling, Elsevier, vol. 75(C), pages 52-62.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Udawatta, Nilupa & Zuo, Jian & Chiveralls, Keri & Zillante, George, 2015. "Improving waste management in construction projects: An Australian study," Resources, Conservation & Recycling, Elsevier, vol. 101(C), pages 73-83.
    2. Tam, Vivian W.Y. & Tam, C.M. & Le, K.N., 2007. "Removal of cement mortar remains from recycled aggregate using pre-soaking approaches," Resources, Conservation & Recycling, Elsevier, vol. 50(1), pages 82-101.
    3. Wang, Jiayuan & Li, Zhengdao & Tam, Vivian W.Y., 2014. "Critical factors in effective construction waste minimization at the design stage: A Shenzhen case study, China," Resources, Conservation & Recycling, Elsevier, vol. 82(C), pages 1-7.
    4. Begum, Rawshan Ara & Siwar, Chamhuri & Pereira, Joy Jacqueline & Jaafar, Abdul Hamid, 2009. "Attitude and behavioral factors in waste management in the construction industry of Malaysia," Resources, Conservation & Recycling, Elsevier, vol. 53(6), pages 321-328.
    5. Lu, Weisheng & Yuan, Hongping, 2010. "Exploring critical success factors for waste management in construction projects of China," Resources, Conservation & Recycling, Elsevier, vol. 55(2), pages 201-208.
    6. Ajayi, Saheed O. & Oyedele, Lukumon O. & Bilal, Muhammad & Akinade, Olugbenga O. & Alaka, Hafiz A. & Owolabi, Hakeem A. & Kadiri, Kabir O., 2015. "Waste effectiveness of the construction industry: Understanding the impediments and requisites for improvements," Resources, Conservation & Recycling, Elsevier, vol. 102(C), pages 101-112.
    7. Lu, Weisheng & Chen, Xi & Peng, Yi & Shen, Liyin, 2015. "Benchmarking construction waste management performance using big data," Resources, Conservation & Recycling, Elsevier, vol. 105(PA), pages 49-58.
    8. Wang, Jiayuan & Yuan, Hongping & Kang, Xiangping & Lu, Weisheng, 2010. "Critical success factors for on-site sorting of construction waste: A china study," Resources, Conservation & Recycling, Elsevier, vol. 54(11), pages 931-936.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:recore:v:53:y:2009:i:3:p:145-148. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Kai Meng (email available below). General contact details of provider: https://www.journals.elsevier.com/resources-conservation-and-recycling .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.