IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v70y2001i3p257-266.html
   My bibliography  Save this article

Machine repairing models for production systems

Author

Listed:
  • Ki Ching, Wai

Abstract

No abstract is available for this item.

Suggested Citation

  • Ki Ching, Wai, 2001. "Machine repairing models for production systems," International Journal of Production Economics, Elsevier, vol. 70(3), pages 257-266, April.
  • Handle: RePEc:eee:proeco:v:70:y:2001:i:3:p:257-266
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(00)00073-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Sztrik, J. & Bunday, B. D., 1993. "Machine interference problem with a random environment," European Journal of Operational Research, Elsevier, vol. 65(2), pages 259-269, March.
    2. אסתר טולידנו, 1993. "מקבלי דמי אבטלה בשנת 1992," Working Papers 475, National Insurance Institute of Israel.
    3. Paul Desruelle & Harold J. Steudel, 1996. "A Queuing Network Model of a Single-Operator Manufacturing Workcell with Machine/Operator Interference," Management Science, INFORMS, vol. 42(4), pages 576-590, April.
    4. Cho, Danny I. & Parlar, Mahmut, 1991. "A survey of maintenance models for multi-unit systems," European Journal of Operational Research, Elsevier, vol. 51(1), pages 1-23, March.
    5. שרית בייץ מוראי & תמר הרון ורבקה ורטמן, 1993. "ביצוע חוק סיעוד במרכזי יום," Working Papers 456, National Insurance Institute of Israel.
    6. Ching, Wai Ki, 1997. "Markov-modulated Poisson processes for multi-location inventory problems," International Journal of Production Economics, Elsevier, vol. 53(2), pages 217-223, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Delasay, Mohammad & Kolfal, Bora & Ingolfsson, Armann, 2012. "Maximizing throughput in finite-source parallel queue systems," European Journal of Operational Research, Elsevier, vol. 217(3), pages 554-559.
    2. Haque, Lani & Armstrong, Michael J., 2007. "A survey of the machine interference problem," European Journal of Operational Research, Elsevier, vol. 179(2), pages 469-482, June.
    3. Wai Ki Ching, 2001. "Markovian approximation for manufacturing systems of unreliable machines in tandem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(1), pages 65-78, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Haque, Lani & Armstrong, Michael J., 2007. "A survey of the machine interference problem," European Journal of Operational Research, Elsevier, vol. 179(2), pages 469-482, June.
    2. Molleman, Eric & Slomp, Jannes & Rolefes, Samantha, 2002. "The evolution of a cellular manufacturing system - a longitudinal case study," International Journal of Production Economics, Elsevier, vol. 75(3), pages 305-322, February.
    3. Kalu, Timothy Ch. U., 1999. "Capital budgeting under uncertainty: An extended goal programming approach," International Journal of Production Economics, Elsevier, vol. 58(3), pages 235-251, January.
    4. Albino, Vito & Pontrandolfo, Pierpaolo & Scozzi, Barbara, 2002. "Analysis of information flows to enhance the coordination of production processes," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 7-19, January.
    5. Malczewski, Jacek & Jackson, Marlene, 2000. "Multicriteria spatial allocation of educational resources: an overview," Socio-Economic Planning Sciences, Elsevier, vol. 34(3), pages 219-235, September.
    6. Manthou, Vassiliki & Vlachopoulou, Maro, 2001. "Bar-code technology for inventory and marketing management systems: A model for its development and implementation," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 157-164, May.
    7. Jensen, Hector A. & Maturana, Sergio, 2002. "A possibilistic decision support system for imprecise mathematical programming problems," International Journal of Production Economics, Elsevier, vol. 77(2), pages 145-158, May.
    8. Papadopoulos, H. T., 1998. "An approximate method for calculating the mean sojourn time of K-station production lines with no intermediate buffers," International Journal of Production Economics, Elsevier, vol. 54(3), pages 297-305, May.
    9. Papadopoulos, H. T. & Vidalis, M. I., 2001. "Minimizing WIP inventory in reliable production lines," International Journal of Production Economics, Elsevier, vol. 70(2), pages 185-197, March.
    10. Kohn, Robert E., 1999. "Thresholds and complementarities in an economic model of preserving and conserving biodiversity," Socio-Economic Planning Sciences, Elsevier, vol. 33(2), pages 151-172, June.
    11. W-K Ching & W-O Yuen & A W Loh, 2003. "An inventory model with returns and lateral transshipments," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(6), pages 636-641, June.
    12. Vastag, Gyula & Montabon, Frank, 2001. "Linkages among manufacturing concepts, inventories, delivery service and competitiveness," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 195-204, May.
    13. Forza, Cipriano & Salvador, Fabrizio, 2002. "Managing for variety in the order acquisition and fulfilment process: The contribution of product configuration systems," International Journal of Production Economics, Elsevier, vol. 76(1), pages 87-98, March.
    14. Forza, C. & Salvador, F., 2001. "Information flows for high-performance manufacturing," International Journal of Production Economics, Elsevier, vol. 70(1), pages 21-36, March.
    15. Schippers, Werner A. J., 2001. "An integrated approach to process control," International Journal of Production Economics, Elsevier, vol. 69(1), pages 93-105, January.
    16. Jimenez, Javier Salinas & Chaparro, Francisco Pedraja & Smith, Peter C., 2003. "Evaluating the introduction of a quasi-market in community care," Socio-Economic Planning Sciences, Elsevier, vol. 37(1), pages 1-13, March.
    17. Bo, Hong, 2001. "Volatility of sales, expectation errors, and inventory investment: Firm level evidence," International Journal of Production Economics, Elsevier, vol. 72(3), pages 273-283, August.
    18. Cook, Wade D. & Green, Rodney H., 2000. "Project prioritization: a resource-constrained data envelopment analysis approach," Socio-Economic Planning Sciences, Elsevier, vol. 34(2), pages 85-99, June.
    19. de Haan, Job & Yamamoto, Masaru & Lovink, Gerben, 2001. "Production planning in Japan: rediscovering lost experiences or new insights?," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 101-109, May.
    20. Portnov, Boris A. & Erell, Evyatar, 2004. "Interregional inequalities in Israel, 1948-1995: divergence or convergence?," Socio-Economic Planning Sciences, Elsevier, vol. 38(4), pages 255-289, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:70:y:2001:i:3:p:257-266. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.