Low costs and carbon dioxide emissions through efficient power production methods in Finland
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- אסתר טולידנו, 1993. "מקבלי דמי אבטלה בשנת 1992," Working Papers 475, National Insurance Institute of Israel.
- שרית בייץ מוראי & תמר הרון ורבקה ורטמן, 1993. "ביצוע חוק סיעוד במרכזי יום," Working Papers 456, National Insurance Institute of Israel.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Molleman, Eric & Slomp, Jannes & Rolefes, Samantha, 2002. "The evolution of a cellular manufacturing system - a longitudinal case study," International Journal of Production Economics, Elsevier, vol. 75(3), pages 305-322, February.
- Kalu, Timothy Ch. U., 1999. "Capital budgeting under uncertainty: An extended goal programming approach," International Journal of Production Economics, Elsevier, vol. 58(3), pages 235-251, January.
- Albino, Vito & Pontrandolfo, Pierpaolo & Scozzi, Barbara, 2002. "Analysis of information flows to enhance the coordination of production processes," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 7-19, January.
- Malczewski, Jacek & Jackson, Marlene, 2000. "Multicriteria spatial allocation of educational resources: an overview," Socio-Economic Planning Sciences, Elsevier, vol. 34(3), pages 219-235, September.
- Manthou, Vassiliki & Vlachopoulou, Maro, 2001. "Bar-code technology for inventory and marketing management systems: A model for its development and implementation," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 157-164, May.
- Jensen, Hector A. & Maturana, Sergio, 2002. "A possibilistic decision support system for imprecise mathematical programming problems," International Journal of Production Economics, Elsevier, vol. 77(2), pages 145-158, May.
- Papadopoulos, H. T., 1998. "An approximate method for calculating the mean sojourn time of K-station production lines with no intermediate buffers," International Journal of Production Economics, Elsevier, vol. 54(3), pages 297-305, May.
- Papadopoulos, H. T. & Vidalis, M. I., 2001. "Minimizing WIP inventory in reliable production lines," International Journal of Production Economics, Elsevier, vol. 70(2), pages 185-197, March.
- Kohn, Robert E., 1999. "Thresholds and complementarities in an economic model of preserving and conserving biodiversity," Socio-Economic Planning Sciences, Elsevier, vol. 33(2), pages 151-172, June.
- Vastag, Gyula & Montabon, Frank, 2001. "Linkages among manufacturing concepts, inventories, delivery service and competitiveness," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 195-204, May.
- Forza, Cipriano & Salvador, Fabrizio, 2002. "Managing for variety in the order acquisition and fulfilment process: The contribution of product configuration systems," International Journal of Production Economics, Elsevier, vol. 76(1), pages 87-98, March.
- Forza, C. & Salvador, F., 2001. "Information flows for high-performance manufacturing," International Journal of Production Economics, Elsevier, vol. 70(1), pages 21-36, March.
- Schippers, Werner A. J., 2001. "An integrated approach to process control," International Journal of Production Economics, Elsevier, vol. 69(1), pages 93-105, January.
- Jimenez, Javier Salinas & Chaparro, Francisco Pedraja & Smith, Peter C., 2003. "Evaluating the introduction of a quasi-market in community care," Socio-Economic Planning Sciences, Elsevier, vol. 37(1), pages 1-13, March.
- Bo, Hong, 2001. "Volatility of sales, expectation errors, and inventory investment: Firm level evidence," International Journal of Production Economics, Elsevier, vol. 72(3), pages 273-283, August.
- Cook, Wade D. & Green, Rodney H., 2000. "Project prioritization: a resource-constrained data envelopment analysis approach," Socio-Economic Planning Sciences, Elsevier, vol. 34(2), pages 85-99, June.
- de Haan, Job & Yamamoto, Masaru & Lovink, Gerben, 2001. "Production planning in Japan: rediscovering lost experiences or new insights?," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 101-109, May.
- Portnov, Boris A. & Erell, Evyatar, 2004. "Interregional inequalities in Israel, 1948-1995: divergence or convergence?," Socio-Economic Planning Sciences, Elsevier, vol. 38(4), pages 255-289, December.
- Panizzolo, Roberto, 1998. "Applying the lessons learned from 27 lean manufacturers.: The relevance of relationships management," International Journal of Production Economics, Elsevier, vol. 55(3), pages 223-240, August.
- Tarantilis, C. D. & Kiranoudis, C. T., 2002. "A list-based threshold accepting method for job shop scheduling problems," International Journal of Production Economics, Elsevier, vol. 77(2), pages 159-171, May.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:41:y:1995:i:1-3:p:387-394. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.