Cyclic and constant-proportion input-control strategies for dedicated flexible manufacturing system operations
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- ברנדה מורגנשטיין ורונית ליברמן, 1981. "שירות המקיף לקשיש בטברי," Working Papers 118, National Insurance Institute of Israel.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Sharafali, Moosa & Co, Henry C. & Goh, Mark, 2004. "Production scheduling in a flexible manufacturing system under random demand," European Journal of Operational Research, Elsevier, vol. 158(1), pages 89-102, October.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Jones, Philip C. & Moses, Leon N. & Zydiak, James L., 1998. "Inventory investment, product cycles, and the imperfectly competitive firm," International Journal of Production Economics, Elsevier, vol. 54(3), pages 267-276, May.
- Lindau, Roger A., 1997. "Automatic data capture and its impact on productivity," International Journal of Production Economics, Elsevier, vol. 52(1-2), pages 91-103, October.
- Lofsten, Hans, 2000. "Measuring maintenance performance - in search for a maintenance productivity index," International Journal of Production Economics, Elsevier, vol. 63(1), pages 47-58, January.
- Knudsen, Daniel C., 2000. "Shift-share analysis: further examination of models for the description of economic change," Socio-Economic Planning Sciences, Elsevier, vol. 34(3), pages 177-198, September.
- Shibuya, Takeshi & Dohi, Tadashi & Osaki, Shunji, 1998. "Optimal continuous review policies for spare part provisioning with random lead times," International Journal of Production Economics, Elsevier, vol. 55(3), pages 257-271, August.
- Otavio Aleotti Maia, Luis & Yahya Qassim, Raad, 1999. "Minimum cost safety stocks for frequent delivery manufacturing," International Journal of Production Economics, Elsevier, vol. 62(3), pages 233-236, September.
- Murillo-Zamorano, Luis R. & Vega-Cervera, Juan A., 2001. "The use of parametric and non-parametric frontier methods to measure the productive efficiency in the industrial sector: A comparative study," International Journal of Production Economics, Elsevier, vol. 69(3), pages 265-275, February.
- Labelle, A. & Langevin, A. & Campbell, J. F., 2002. "Sector design for snow removal and disposal in urban areas," Socio-Economic Planning Sciences, Elsevier, vol. 36(3), pages 183-202, September.
- Kengpol, Athakorn & O'Brien, Christopher, 2001. "The development of a decision support tool for the selection of advanced technology to achieve rapid product development," International Journal of Production Economics, Elsevier, vol. 69(2), pages 177-191, January.
- Maia, Luis Otavio Aleotti & Lago, Regina Araujo & Qassim, Raad Yahya, 1997. "Selection of postharvest technology routes by mixed-integer linear programming," International Journal of Production Economics, Elsevier, vol. 49(2), pages 85-90, April.
- Rempala, R., 1999. "On a forward algorithm for a generalized production inventory problem," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 455-461, March.
- Dobos, Imre, 2001. "Production strategies under environmental constraints: Continuous-time model with concave costs," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 323-330, May.
- Girlich, Hans-Joachim & Chikan, Attila, 2001. "The origins of dynamic inventory modelling under uncertainty: (the men, their work and connection with the Stanford Studies)," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 351-363, May.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:39:y:1995:i:3:p:193-200. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.