Document-centered information systems to support reactive problem-solving in manufacturing
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- דליה גורדון ואסתר טולידנו, 1986. "דמי לידה," Working Papers 384, National Insurance Institute of Israel.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Zong, Wei & Wu, Feng & Chu, Lap-Keung & Sculli, Domenic, 2015. "A discriminative and semantic feature selection method for text categorization," International Journal of Production Economics, Elsevier, vol. 165(C), pages 215-222.
- Fujimoto, Takahiro & Park, Young Won, 2014. "Balancing supply chain competitiveness and robustness through “virtual dual sourcing”: Lessons from the Great East Japan Earthquake," International Journal of Production Economics, Elsevier, vol. 147(PB), pages 429-436.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Portnov, B. A. & Etzion, Y., 2000. "Investigating the effects of public policy on the interregional patterns of population growth: the case of Israel," Socio-Economic Planning Sciences, Elsevier, vol. 34(4), pages 239-269, December.
- Gorman, Michael F. & Brannon, James I., 2000. "Seasonality and the production-smoothing model," International Journal of Production Economics, Elsevier, vol. 65(2), pages 173-178, April.
- Malczewski, Jacek & Jackson, Marlene, 2000. "Multicriteria spatial allocation of educational resources: an overview," Socio-Economic Planning Sciences, Elsevier, vol. 34(3), pages 219-235, September.
- Palocsay, Susan W. & Wang, Ping & Brookshire, Robert G., 2000. "Predicting criminal recidivism using neural networks," Socio-Economic Planning Sciences, Elsevier, vol. 34(4), pages 271-284, December.
- Garg, Suresh & Vrat, Prem & Kanda, Arun, 2001. "Equipment flexibility vs. inventory: A simulation study of manufacturing systems," International Journal of Production Economics, Elsevier, vol. 70(2), pages 125-143, March.
- Forza, C. & Salvador, F., 2001. "Information flows for high-performance manufacturing," International Journal of Production Economics, Elsevier, vol. 70(1), pages 21-36, March.
- Schippers, Werner A. J., 2001. "An integrated approach to process control," International Journal of Production Economics, Elsevier, vol. 69(1), pages 93-105, January.
- Bell, Michelle L. & Hobbs, Benjamin F. & Ellis, Hugh, 2003. "The use of multi-criteria decision-making methods in the integrated assessment of climate change: implications for IA practitioners," Socio-Economic Planning Sciences, Elsevier, vol. 37(4), pages 289-316, December.
- Gunasekaran, A., 1999. "Just-in-time purchasing:: An investigation for research and applications," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 77-84, March.
- Erel, Erdal, 1998. "A study on production lines with discrete batch WIP inventory transfer," International Journal of Production Economics, Elsevier, vol. 55(1), pages 71-85, June.
- Panizzolo, Roberto, 1998. "Applying the lessons learned from 27 lean manufacturers.: The relevance of relationships management," International Journal of Production Economics, Elsevier, vol. 55(3), pages 223-240, August.
- Weistroffer, H. Roland & Wooldridge, Blue E. & Singh, Rahul, 1999. "A multi-criteria approach to local tax planning," Socio-Economic Planning Sciences, Elsevier, vol. 33(4), pages 301-315, December.
- Kengpol, Athakorn & O'Brien, Christopher, 2001. "The development of a decision support tool for the selection of advanced technology to achieve rapid product development," International Journal of Production Economics, Elsevier, vol. 69(2), pages 177-191, January.
- Muda, Shaladdin & Hendry, Linda, 2002. "Developing a new world class model for small and medium sized make-to-order companies," International Journal of Production Economics, Elsevier, vol. 78(3), pages 295-310, August.
- Buxey, Geoff, 1995. "A managerial perspective on aggregate planning," International Journal of Production Economics, Elsevier, vol. 41(1-3), pages 127-133, October.
- Ariss, Sonny S. & Zhang, Qingyu, 2002. "The impact of flexible process capability on the product-process matrix: an empirical examination," International Journal of Production Economics, Elsevier, vol. 76(2), pages 135-145, March.
- Lovell, Michael C., 1996. "Macroeconomic implications of S,s versus accelerator finished goods inventory strategies," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 55-64, August.
- Guimaraes, Tor & Yoon, Youngohc & Clevenson, Aaron, 1997. "Empirically testing ES success factors in business process reengineering," International Journal of Production Economics, Elsevier, vol. 50(2-3), pages 245-259, June.
- Forza, Cipriano & Filippini, Roberto, 1998. "TQM impact on quality conformance and customer satisfaction: A causal model," International Journal of Production Economics, Elsevier, vol. 55(1), pages 1-20, June.
- Cai, D. Q. & Xie, M. & Goh, T. N. & Tang, X. Y., 2002. "Economic design of control chart for trended processes," International Journal of Production Economics, Elsevier, vol. 79(2), pages 85-92, September.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:38:y:1995:i:1:p:31-58. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.