A coordinated order-up-to inventory control policy for a single supplier and multiple buyers using electronic data interchange
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Banerjee, Snehamay & Banerjee, Avijit & Burton, Jonathan & Bistline, William, 2001. "Controlled partial shipments in two-echelon supply chain networks: a simulation study," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 91-100, May.
- Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
- Tarhini, Hussein & Karam, Mario & Jaber, Mohamad Y., 2020. "An integrated single-vendor multi-buyer production inventory model with transshipments between buyers," International Journal of Production Economics, Elsevier, vol. 225(C).
- Beck, Fabian G. & Glock, Christoph H. & Kim, Taebok, 2017. "Coordination of a production network with a single buyer and multiple vendors with geometrically increasing batch shipments," International Journal of Production Economics, Elsevier, vol. 193(C), pages 633-646.
- Glock, Christoph H., 2012. "Coordination of a production network with a single buyer and multiple vendors," International Journal of Production Economics, Elsevier, vol. 135(2), pages 771-780.
- Petering, Matthew E.H. & Chen, Xi & Hsieh, Wen-Huan, 2019. "Inventory control with flexible demand: Cyclic case with multiple batch supply and demand processes," International Journal of Production Economics, Elsevier, vol. 212(C), pages 60-77.
- Hossain, Md Shahriar J. & Ohaiba, Mohamed M. & Sarker, Bhaba R., 2017. "An optimal vendor-buyer cooperative policy under generalized lead-time distribution with penalty cost for delivery lateness," International Journal of Production Economics, Elsevier, vol. 188(C), pages 50-62.
- Bikash Koli Dey & Biswajit Sarkar & Sarla Pareek, 2019. "A Two-Echelon Supply Chain Management With Setup Time and Cost Reduction, Quality Improvement and Variable Production Rate," Mathematics, MDPI, vol. 7(4), pages 1-25, April.
- Zavanella, Lucio & Zanoni, Simone, 2009. "A one-vendor multi-buyer integrated production-inventory model: The 'Consignment Stock' case," International Journal of Production Economics, Elsevier, vol. 118(1), pages 225-232, March.
- Ali Ekici & Baṣak Altan & Okan Örsan Özener, 2016. "Pricing decisions in a strategic single retailer/dual suppliers setting under order size constraints," International Journal of Production Research, Taylor & Francis Journals, vol. 54(7), pages 1887-1898, April.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:35:y:1994:i:1-3:p:85-91. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.