IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v195y2018icp74-95.html
   My bibliography  Save this article

Integrated lot sizing and safety stock placement in a network of production facilities

Author

Listed:
  • Kumar, Kunal
  • Aouam, Tarik

Abstract

In a network of production facilities, safety stock placement is determined at the network level to hedge against uncertainty in demand, while considering the production cycle time (PCT) of each stage as an exogenous parameter. The lot sizing policy at each stage affects setup time, capacity, and is a major determinant of queuing behavior and PCT. This paper integrates strategic safety stock placement and tactical lot sizing, which are typically optimized independently. We model the integrated problem to minimize system-wide production and inventory costs subject to meeting service-level requirements of external customers. We establish bounds for optimal lot sizes and extend existing safety stock placement dynamic programming algorithm to solve the integrated problem. Based on numerical experiments, we assess the value of integrating the two decisions and find that integration leads to smaller lot sizes, shorter lead times, and favors pooling of safety stocks. The setup cost, setup time, and the added value at a production stage are the most significant factors in determining the amount of savings generated through integration. In addition, simulation studies show that integration reduces PCT variability and decreases the fraction of delayed items.

Suggested Citation

  • Kumar, Kunal & Aouam, Tarik, 2018. "Integrated lot sizing and safety stock placement in a network of production facilities," International Journal of Production Economics, Elsevier, vol. 195(C), pages 74-95.
  • Handle: RePEc:eee:proeco:v:195:y:2018:i:c:p:74-95
    DOI: 10.1016/j.ijpe.2017.10.006
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527317303092
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2017.10.006?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Aouam, Tarik & Kumar, Kunal, 2019. "On the effect of overtime and subcontracting on supply chain safety stocks," Omega, Elsevier, vol. 89(C), pages 1-20.
    2. Ghadimi, Foad & Aouam, Tarik, 2021. "Planning capacity and safety stocks in a serial production–distribution system with multiple products," European Journal of Operational Research, Elsevier, vol. 289(2), pages 533-552.
    3. Kumar, Kunal & Aouam, Tarik, 2019. "Extending the strategic safety stock placement model to consider tactical production smoothing," European Journal of Operational Research, Elsevier, vol. 279(2), pages 429-448.
    4. Zied Bahroun & Nidhal Belgacem, 2019. "Determination of dynamic safety stocks for cyclic production schedules," Operations Management Research, Springer, vol. 12(1), pages 62-93, June.
    5. Barros, JĂșlio & Cortez, Paulo & Carvalho, M. Sameiro, 2021. "A systematic literature review about dimensioning safety stock under uncertainties and risks in the procurement process," Operations Research Perspectives, Elsevier, vol. 8(C).
    6. Johnson, Andrew & Carnovale, Steven & Song, Ju Myung & Zhao, Yao, 2021. "Drivers of fulfillment performance in mission critical logistics systems: An empirical analysis," International Journal of Production Economics, Elsevier, vol. 237(C).
    7. Riyadh Jamegh & AllaEldin Kassam & Sawsan Sabih, 2019. "Employment of advanced approach to control inventory level by monitoring Safety Stock in Supply Chain under Uncertain environment," Proceedings of International Academic Conferences 8711585, International Institute of Social and Economic Sciences.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:195:y:2018:i:c:p:74-95. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.